Ultimate Foundations is a foundation contractor, based in Christchurch. We build the slab a house stands on. This page says what we build, who we are, who decides the things a contractor does not decide, and how you can check any of it without taking our word for anything.

Reinforcing mesh on chairs over membrane with pink set-out marks, a paddock and mountains beyond

Who we are

A Christchurch foundation contractor, writing about Canterbury ground.

The company's legal name, and the numbers you would use to look it up, are at the foot of every page here, and the credentials page puts them beside the registers you look them up on. That page also sets out what a licence, a record of work and a product certificate each are, and how to check any contractor — this one included — without having to ask the contractor for anything.

The licence for foundation work sits with the managing director, who reads the technical pages here before they go up. He has a page of his own, setting out what he will put his name to and what he will not. The second list is the more useful one: nothing about a reader's own section or its ground category, and no engineering design of any kind.

What we build

UF builds pod raft foundations for and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

Which of the three a job uses is what the engineer's plans say, not something chosen here. The guides describe them as system types, because that is what the choice is actually between.

Some of the pages here describe work we sell. Each of those says so in a section of its own headed "What we do here", so you can tell at a glance whether you are reading an explanation or a description of something we would quote. The rest describe work we do not sell, and they say that too.

A boom pump pouring a steel-and-pod floor on a rise while a client and a child watch from the boxing

What you are trying to get

A foundation is poured once. Everything built after it stands on it, and the decisions that settle it — what the ground is, what the engineer draws, what the consent asks for — are made before anyone is on site.

Most people meet the words technical category and geotechnical report for the first time in a quote or a set of plans, at the point where a decision is already due. These pages put them in front of you earlier, and say who holds each one.

A boxed building platform covered in white insulation pods laid in a grid, houses and hills beyond

Four things settle whether a foundation was done right

Whether a foundation was done right is not a matter of taste, and it is not something you have to take on trust. Four things settle it, and each of them leaves a document behind.

The ground investigation

What it found, before the design was drawn.

The engineer's design

What was drawn from what the ground turned out to be.

The council's inspection

What the council inspected before the concrete went in.

The paperwork at the end

What reached you, and what you need for the code compliance certificate.

Not one of those four is the concrete contractor's to decide, and not one of them is held only by the contractor afterwards. That is the useful thing to know about this part of a build, and it is what these pages are written around.

When a foundation goes wrong, the concrete is rarely the expensive part. It is the design done twice, the inspection that did not pass and has to be booked again, and a frame that cannot go up until the floor under it does.

Start here

Who decides what

The decisions that shape a foundation mostly belong to people the person paying for it has not met.

The geotechnical report

Says what the ground under a section is, and how far down anyone looked. The category it gives is a statement about that section, from that report.

The engineer

Decides the design: the foundation type, the depths, the steel, and what has to be in place before a pour.

The council

Decides what the building consent asks for, and which inspections happen when.

The builder

Holds the programme for the house.

The contractor

Builds what the engineer drew, to the conditions on the consent, and calls the inspections the consent lists.

That order is why every service page has a section headed "What the engineer decides". It is where the authority sits, and it is worth knowing before you are asked to sign anything.

How these pages are written

Every fact here names the document it came from, the edition or the part of it where there is one, and the day that document was read. Where the answer belongs to somebody else — a geotechnical report, an engineer, a council — the page says whose it is instead of answering it.

How we write and check these guides sets the method out in full: who writes them, who checks them, what the date at the top of a page means, and what happens when one of them is wrong.

Sources

The statements behind this page are sourced where they are made — on the credentials page, on the foundation pages and in the ground guides — each with the document it came from and the day that document was read.

Technical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guide