Insulated slabs and slab edge insulation: what H1/AS1 asks of a concrete floor

As at · 12 sources

The short answer

An insulated slab is a concrete floor slab with insulation at its edge, under it, or both. Whether a slab needs it, and how much, comes out of the energy-efficiency calculation for the whole house under H1, the energy-efficiency clause of the Building Code, because the slab counts in that calculation whether it is insulated or not. H1's Acceptable Solution, H1/AS1, is where the options are set out.

Key points

  • The H1/AS1 slab tables cover these options: no insulation; R1.0 vertical edge insulation; a 1.2 m perimeter strip of R1.2 or R2.4 insulation under the slab; full-cover R1.2 or R2.4 underslab insulation; and edge insulation combined with underslab insulation.1
  • Under the 6th edition a slab still has a construction R-value in the house's heat-loss calculation, taken from the Appendix E tables or from H1/VM1; the slab's area-to-perimeter ratio drives the result, and where edge insulation covers only part of the perimeter the value is pro-rated.2
  • The 6th edition removed the schedule method, and in the calculation method it removed the minimum construction R-value for slab-on-ground floors.3

What is an insulated slab?

A concrete floor slab with insulation placed where H1/AS1's slab tables allow for it: a vertical strip at the edge, a strip under the slab round the perimeter, full cover under the slab, or edge and underslab insulation combined, as the key points above list.

A building platform fully covered in insulation pods, with the edge boxing and its clips, houses and fences beyond

What does "fully insulated" mean for a slab?

Ask whoever uses the phrase which option they mean. It is not one of the options in the list H1/AS1's slab tables cover, quoted in the key points above, so it names none of them exactly.

Does a slab have to be insulated?

Under the 6th edition of H1/AS1, there is no fixed minimum R-value for a slab without heating, as the key points above quote, but the slab still counts in the calculation for the whole house. Which edition applies turns on when the building consent application goes in:

The 6th edition of H1/AS1 took effect on 27 November 2025, and does not apply to building consent applications submitted before that date.4 The 5th edition of H1/AS1 may be used for building consent applications submitted before 27 November 2026. From that date the 6th edition applies.5

Does the climate in Canterbury change what a slab needs?

H1/AS1 gives climate zones by district, and Christchurch, Selwyn and Waimakariri share one:

H1/AS1 puts Christchurch City, Selwyn District and Waimakariri District in climate zone 5, in both the 5th and the 6th editions.6

The zone does not change a slab's own value. It changes the target the house is measured against:

H1/AS1's slab tables give a slab's construction R-value by floor type, insulation type, cladding, wall thickness and the slab's area-to-perimeter ratio; climate zone is not one of their inputs. Only the target the whole house is compared against moves between zones.7

Is thicker edge insulation worth paying for?

H1/AS1's own answer:

H1/AS1 gives slab values only for R1.0 vertical edge insulation, and says that raising the R-value of vertical edge insulation above R1.0 m²·K/W adds very little thermal benefit.8

Whether a particular house gains from more is a question for the calculation behind its consent application.

Two crew members fitting edge insulation along the boxing, a site radio beside them

What happens to the insulation at the edge of the slab?

It stays exposed at the outside of the slab, and H1/AS1 says how it should be looked after:

H1/AS1 says slab perimeter insulation should be protected against water absorption, UV exposure and impact damage, and that encapsulating it is not recommended because moisture can get trapped.9
The stepped edge of a cured slab with its permanent edge form, grass and a fence beyond

What about a garage or porch on the same slab?

H1/AS1 treats parts of a slab outside the heated house separately, and says why the decision is made before the pour:

H1/AS1 says parts of a slab outside the thermal envelope, such as a porch, an attached garage or a store, should be thermally separated with vertical edge insulation; and because slab insulation cannot easily be retrofitted, it recommends insulating the floor of a garage that might later be converted.10

On site that decision becomes a break between the garage slab and the heated floor beside it — insulation standing up between the two before either is poured. It is not something that can be slid in later, because by then each slab is hard against the other.

What changes with underfloor heating?

The reason is worth one plain sentence, because the rules make no sense without it: a heated slab is a heater, and without insulation under it and at its edge it spends its warmth on the ground it sits on — downwards, and out through the edge — before any of it reaches the room. So a heated floor keeps a minimum of its own:

Under the 6th edition, heated floors, including underfloor and undertile heating, keep their own minimum R-values, except where the heating is only in rooms with a shower, bath or toilet.11

What goes on top of it matters too:

H1/AS1 notes that floor coverings, for example carpet or cork, will reduce the efficiency of the heated floor. The note is about efficiency: it does not change the construction R-value a heated floor needs.12

Does a pod raft need insulation?

The same calculation decides it for a pod raft as for any other slab. What a pod raft is, and what the engineer decides about it, is in Pod raft foundations; how it compares with a waffle slab and a ring foundation is in Pod rafts, waffle slabs and ring foundations.

Who to contact

A geotechnical engineer
What the ground under your section is, and what it will carry. They investigate it and write the report the foundation is designed from.
The engineer who designs your foundation
What goes under the house, and why. Thickness, steel, beams and the system itself are settled here.
Your council
Whether the work needs a building consent, what has to be shown, and when it is inspected.
The Licensed Building Practitioners register
Whether the person doing restricted building work holds a licence for it. It is a free public search and it takes a minute.
Us
What we would build, what it would cost, and what we would need from you before we could start.

If you are told something is not possible, it is always worth asking which of these decided it. The ground and the Code are fixed. A design and a programme sometimes are not.

What we do here

This page describes what H1/AS1 says about slab insulation, not our work. What we build is set out on the foundation pages.

Send the plans and the address. We will tell you which insulation options your design allows, what each one changes about the slab, and when it has to be settled.

Sources

H1/AS1 is published by MBIE in editions, and the edition a consent application uses is the one that applies to it. Each numbered source below names the edition and the part it quotes.

  1. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, Appendix E, E.1.2.1. Checked . Read the source
  2. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, paragraphs 2.1.3.1 c), E.1.1.1, E.1.2.2 and E.1.2.3. Checked . Read the source
  3. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, Main changes in this version. Checked . Read the source
  4. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, Preface, Document status. Checked . Read the source
  5. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, Preface, Document status. Checked . Read the source
  6. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, Appendix C, Table C.1.1.2. Checked . Read the source
  7. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, Appendix E, E.1.2.1 and comments 3 to 5. Checked .
  8. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, Appendix E, E.1.2.1 comment 4. Checked . Read the source
  9. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, paragraph 2.1.1.4, comment. Checked . Read the source
  10. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, Appendix E, E.1.2.1 comments 1 and 2. Checked . Read the source
  11. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, paragraph 2.1.2.12 and Table 2.1.2.12. Checked . Read the source
  12. MBIE, H1 Energy efficiency, Acceptable Solution H1/AS1, 6th edition, Table 2.1.2.12, note (5). Checked .