What it is

On this page a structural slab is a concrete floor slab an engineer has designed for one site, rather than one built from a standard's own details or from one of MBIE's ready-made options. The name for that is :

MBIE's guide for Canterbury builders on below-floor work says specific engineering design is needed where the design or design method is non-standard, meaning outside the Acceptable Solution or Verification Method, and that it will usually be done by a Chartered Professional Engineer (CPEng).1

Even a slab built from the standard's own details is reinforced concrete now:

B1/AS1 (Structural provisions for buildings), in its second edition in effect from 28 July 2025, changes NZS 3604 so that all slab-on-ground floors must be reinforced concrete. B1/AS1 is an acceptable solution: one way to comply with the Building Code.2

So what makes a slab structural here is not the concrete or the steel. It is that the engineer designs it for the ground under that house, from the investigation of that ground, and the drawings show the result.

What the engineer decides

First, whether a slab from the standard or one of MBIE's options can be used at all. That turns on the ground. Where good ground cannot be confirmed, the standard's own details are not the answer on their own:

MBIE's guidance says that where good ground cannot be confirmed, the NZS 3604 concrete floor and foundation provisions should not be used without specific engineering design input, and that in many areas of greater Christchurch the good-ground provisions may not apply.3

On and TC2 land, MBIE's guidance sets out, by how much load the ground can carry, where the standard's foundations and MBIE's own options stop and a foundation designed for the site starts:

On TC1 land, MBIE's guidance accepts NZS 3604 timber piles or tied NZS 3604 concrete slabs where a shallow investigation shows an ultimate bearing capacity above 300 kPa; between 200 and 300 kPa it points to the TC2 slab options or other specific design, and below 200 kPa, or where there is peat, to specific design.4On TC2 land, MBIE's guidance uses NZS 3604 timber piles or an enhanced perimeter foundation wall where the ground is above 300 kPa, the enhanced slab Options 1 to 4 or other specific design where it is above 200 kPa, and specific design below that.5

A figure from a quick test on site is not the end of that question:

MBIE's guidance says a bearing capacity estimated from Scala penetrometer results must be adjusted for the soil type, the geometry of the foundation and the depth of the water table, and that peat deposits and non-engineered fill must always be given due regard.6

On TC3 land the council's own description of the land asks for a site-specific investigation and foundation design:

The council describes TC3 land as land where moderate to significant damage from liquefaction is possible in future significant earthquakes, and where a site-specific geotechnical investigation and a specific engineering foundation design are required.7

What MBIE's guidance sets out for that land is in TC3 foundations, to specific engineering design.

The house matters as well as the ground:

MBIE's guide for Canterbury builders on below-floor work says repairing or rebuilding a timber-framed house generally needs specific engineering design if it is more than two storeys or 10 m high, or involves foundations in TC3.8

And some variations of MBIE's own options need a design of their own:

MBIE's TC2 Option 3, a grid of beams with a slab, has a post-tensioned variation, and the guidance says that variation requires specific engineering design.9

Where the slab is designed for the site, the investigation comes before the design, and the engineer sets the thickness, the beams, the steel, the joints and what the slab sits on, on the drawings:

Where the ground does not meet the 300 kPa or 200 kPa thresholds and a specifically designed foundation is used, MBIE's guidance says geotechnical investigations of the site, in accordance with Table 5.2, are to be carried out before the foundation system is designed, and the design must allow for lateral ground spreading to the extent the investigation indicates.10

The engineer's work goes to the council with the consent application:

Where the foundations are specifically designed, Christchurch City Council's consent checklist for a house says structural calculations are required, and that they should include a producer statement for design (PS1).11

What happens on site

The ground is prepared to the levels and depths on the drawings. What the digging finds may not match what the investigation found at its test points, and the guidance says a difference should go back:

NZGS and MBIE's guidance on geotechnical investigations says a geotechnical report should state that its recommendations rest on a limited amount of data and that conditions between the places tested may vary, and that variations found during later excavations should be passed back to the report's author.12

Then the edges are boxed, the pipes and ducts the drawings show are set in place, and the steel is placed and tied as the design shows. Nothing is poured until the council has inspected:

Christchurch City Council's inspection called Foundation or Slab happens before the concrete is poured. For a slab on the ground the inspector checks, among other things, that the damp-proof membrane is lapped and taped, the reinforcing is placed and tied, the mesh is supported on chairs, and shrinkage control joints are formed; the council says these are minimum requirements, and if any is not met the inspection fails.13

The building consent sets which inspections happen, and on a slab designed for the site they can include the engineer's:

MBIE says a building consent comes with an inspection schedule listing the inspections the council will do, which may include inspections by others, such as engineers.14A council may make it a condition of the building consent that a chartered professional engineer monitors parts of the work and provides a PS4 producer statement; the guidance says the engineer who designed the work is often the best person to do it.15

The law sets who may do or supervise this work, and what they hand over when it is done:

Foundation work on a house that needs a building consent is restricted building work, which a Licensed Building Practitioner licensed for that work must carry out or supervise, unless an owner-builder does it on their own home under the Act's owner-builder exemption.16The Foundations licence for Licensed Building Practitioners has two areas of practice: “Foundations 1: Concrete foundation walls and concrete slab-on-ground” and “Foundations 2: Concrete or timber pile foundations”.17When their part of the restricted building work is finished, each Licensed Building Practitioner who carried it out or supervised it writes a record of work, and gives one copy to the building owner and one to the council.18

What changes the price

The price comes from your plans, the geotechnical report and the engineer's design. What moves it:

  • The engineering. A slab designed for the site needs the investigation, the design and the calculations, and the council may send them to a specialist engineer. Christchurch City Council's guide to building consent fees lists specialist reviews by a structural, geotechnical or fire engineer as a variable charge that depends on how complex the work is.19
  • The ground. How far down the design has to go to reach ground that carries the load, and what has to be dug out or brought in.
  • The house. Its weight, its shape and its storeys change the slab the engineer draws.
  • The slab itself: its thickness, its beams and its steel, all of which come from the design.
  • The inspections: where the consent calls for the engineer to inspect, that is part of the job.
  • The site. How machinery and concrete trucks get in, and how much ground work comes before the slab.

What we need from you

A structural slab is priced from its papers, whoever prices it:

  • the plans, and the engineer's design and calculations;
  • the geotechnical report for the section;
  • the site address, and anything that affects getting onto the site;
  • who the builder is, if you have one.

Frequently asked

Is a structural slab the same as a pod raft?

Not necessarily. A pod raft is one way to build a slab: concrete poured over polystyrene pods, with concrete ribs between them. Whether a slab, pods or not, is designed for the site depends on the ground and the house, as set out above. How a pod raft goes in is in Pod raft foundations.

How thick is a structural slab?

There is no one answer: the thickness is on the engineer's drawings. Even among MBIE's ready-made options, the thickness changes with the house:

MBIE's TC2 Option 2 is a thick slab over the existing soil, and its thickness goes up to 400 mm for a two-storey house with brick veneer, whatever the weight of the roof.20

What a slab designed for one site needs is worked out for that site.

Does a structural slab need a producer statement?

The council's consent checklist says the calculations for specifically designed foundations should include one, as set out above. What that statement is, and what it is not:

Practice Note 1 on producer statements says a PS1 is for a suitably qualified design professional, such as a CPEng, to give as a statement of opinion: it should record how the design complies, normally covers only the specifically designed elements, should always come with documentation that establishes the means of compliance, usually calculations, and is not a product warranty or a guarantee of compliance.21MBIE says producer statements have no particular status under the Building Act 2004: a council may treat one as one source of information when deciding whether work complies with the Building Code, so long as it accepts the statement as accurate and reliable, and it uses its own judgement on how much weight to give it.22

What does a structural slab change in the programme?

Mostly the order things happen in, and who has to be ready for each step. The investigation comes before the design, the engineer's calculations go in with the consent application, and the council may send them to a specialist engineer. On site, nothing is poured until the council has inspected, and the engineer may need to inspect too where the consent says so. A step that is waiting holds up every step after it.

What we do here

UF builds pod raft foundations for TC1 and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

Send the plans and the engineer's design if there is one. We will tell you what the slab involves, what moves its price, and which parts of the job are ours.

Sources

MBIE's Canterbury guidance, Part A, is published on building.govt.nz.

See also the specific engineering design entry in the glossary.

  1. MBIE, The guide for Canterbury builders, Below-floor work, April 2013, pages 6 to 8. Checked . Read the source
  2. MBIE, B1/AS1 Structural provisions for buildings, Second Edition, Preface and paragraphs 2.3.7.1 to 2.3.7.3. Checked . Read the source
  3. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 5.2. Checked . Read the source
  4. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), Tables 5.1 and 5.2. Checked . Read the source
  5. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), Table 5.2. Checked . Read the source
  6. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.4.1. Checked . Read the source
  7. Christchurch City Council, Technical categories information. Checked . Read the source
  8. MBIE, The guide for Canterbury builders, Below-floor work, April 2013, pages 6 to 8 and 20. Checked . Read the source
  9. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 5.3.1, Figures 5.7 to 5.9. Checked . Read the source
  10. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012 update), section 5.4, Guidance for specific engineering design. Checked . Read the source
  11. Christchurch City Council, Form B-062 Application checksheet, single residential dwellings, version 22 (last updated 16 December 2025), items 5a and 5b. Checked . Read the source
  12. NZGS and MBIE, Earthquake geotechnical engineering practice, Module 2, Geotechnical investigations for earthquake engineering, November 2021, section 5.1.5. Checked .Source: New Zealand Geotechnical Society and Ministry of Business, Innovation and Employment, Earthquake geotechnical engineering practice, Module 2 (November 2021), reproduced in part with the copyright owner's authorisation. Licence terms
  13. Christchurch City Council, Guide to Building Inspections (B-306), version 10 (last updated 15 June 2026), pages 7 and 8, Foundation or Slab. Checked .
  14. MBIE, Certificates of work guidance (July 2013), On-site monitoring. Checked .Source: Ministry of Business, Innovation and Employment, Guidance on the use of Certificates of Work, Producer Statements, and Design Features Reports (July 2013). © Crown copyright 2013. Licence terms
  15. Building Act 2004, and the Building (Definition of Restricted Building Work) Order 2011, versions as at 8 October 2026 and 15 January 2026, sections 84 and 90D; Order clauses 3 and 5. Checked .
  16. Licensed Building Practitioners, What do I need to show to get my Foundations licence (factsheet), version 2. Checked . Read the sourceSource: Licensed Building Practitioners scheme (MBIE), What do I need to show to get my Foundations licence (factsheet, version 2), lbp.govt.nz. © Crown copyright. Licence terms
  17. Licensed Building Practitioners, Construction process (restricted building work). Checked . Read the sourceSource: Licensed Building Practitioners scheme (MBIE), lbp.govt.nz. © Crown copyright. Licence terms
  18. Christchurch City Council, Guide to building consent fees and charges, 2025/26. Checked . Read the source
  19. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 5.3.1, Figure 5.6. Checked . Read the source
  20. Practice Note 1, producer statements, Version 3 (January 2014), section 3.2.1. Checked .
  21. MBIE, Producer statements (building.govt.nz), last updated 6 December 2022. Checked . Read the source
Specific engineering designDesign where the design or design method is non-standard, outside the Acceptable Solution or Verification Method. It is usually done by a Chartered Professional Engineer.MBIE, The guide for Canterbury builders: Below-floor work, April 2013 · as at 15 September 2026Read the guideTechnical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guide