What a foundation costs, and what it is worth

As at

Judge a foundation on what it is worth for as long as you live in the house, and see what moves its price.

Send the plans

Close along an edge beam, steel tied over white pods, edge insulation inside the boxing and a yellow cap on a starter bar

What is a foundation worth?

Everything in the house stands on it, and once the frame is up it is out of sight and out of reach. Kitchens are replaced and bathrooms are redone. A foundation is poured once, and you live on it for as long as you own the house.

So judge a quote by what the foundation will be worth while you live there: whether the floor you wanted is in it, whether the pipes and cables come up where you need them, and whether what was built is what the engineer designed. Something left out to bring the number down comes back later, as a variation before the pour or as something in the floor you can no longer have.

Why is every foundation quoted?

Two sections of the same floor area can need different foundations. The ground, the shape of the house and the floor level against the existing ground all differ, and the engineer designs to all three. A foundation can be priced once somebody has seen the site and the drawings.

What moves the price?

  • The perimeter. A long or broken outline is more edge beam, more formwork and more edge insulation for the same square metres. The same floor area can be a different foundation.
Two house plans of the same floor area side by side. The first is compact and square. The second is long and narrow. Both are drawn with the outside edge as a heavy line, and the long plan has noticeably more of it.
  • The floor level against the ground that is already there. Whether the section is dug down or built up to reach the level on the drawings, how deep the formwork sits, and where any surplus ends up.
  • Set-downs, thicker patches and anything through the slab. A shower with no lip, a doorway with no step, a thicker patch where something heavy will stand, every pipe and conduit coming up through the slab. Each one is formwork and detailing.
  • Getting the truck and the pump in. How close they can get, how the section slopes, what is overhead, and whether anybody is barrowing concrete. Each one changes the plant and the hours.
  • The engineer's design. The steel, the slab thickness and the beam sizes are the engineer's, and the price follows the design.
  • The ground. What the excavation finds, against what the report said.

How does the ground change the price?

The geotechnical report sets what the ground will take, and the engineer designs to it. Ground that needs more, such as deeper beams, more steel or ground improvement before anything is poured, makes a larger foundation before you have chosen anything that goes in it.

Occasionally the excavation finds something the report did not expect. That difference is the part of a foundation price that cannot be fixed in advance. If you are told the ground requires something, ask whether the geotechnical engineer, the structural engineer or the council made that call. Some of those decisions can change.

Two people at the edge of an excavation, an excavator working on the hill behind them

How do you tell a small change from a big one?

Ask what the cost attaches to. You can size each answer yourself:

  • A length of material and a few minutes. A spare empty conduit with a draw string in it is a pipe, and the time to tie it in while the boxing is down. If that is what it is, ask for it.
  • A trade coming back. Anything that needs the plumber or the electrician on site at a set moment has a visit attached, however small the part. Raised early, it joins a visit that was happening anyway.
  • A whole system. Underfloor heating is pipe, a manifold, a heat source and somebody to commission it. It belongs in the budget conversation.
  • The engineer's design. If it changes the foundation itself, such as a different type, thickness or layout of steel, it is a design change. The design is redone before anyone can price it.

Which of the four you are asking about usually tells you whether to raise it.

When is the same thing cheapest?

Before your drawings go out for pricing. The floor is priced once, against the drawings as they stand when the quotes are asked for. What is on them is part of the job; the same thing asked for later is a change to work already priced and agreed.

A model of the slab shows here when the page can draw it.

Settle what you want before the plans go out, weeks before the pour.

What should you ask for in a quote?

Beside the number, ask for:

  • The assumptions. Which revision of the drawings it was priced against, which geotechnical report, and what the building platform is taken to be. These are what move a price after it is given.
  • What is excluded, and where the foundation stops. A budget usually goes in the gap between one trade and the next, and where the foundation scope ends shows what somebody else will charge you for.
  • Provisional sums, separated out. Some parts of a foundation cannot be fixed until the ground is open. On a line of their own, they show which part of the number is firm.

Before the foundation is priced, ask your builder four questions.

What if two quotes do not match?

Compare the assumptions first. Two prices for the same house can differ because they price different jobs. One may include removing unsuitable material and the other not. One may price the engineer's current design, the other a design two revisions old.

Ask each one: what have you left out?

What we do here

UF builds pod raft foundations for and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

Send the plans and the address, and the geotechnical report if there is one. If the drawings are not final, say what is still open. You will get a price written against your drawings, with what it assumes on the same page as the number.

Technical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guide