For builders: a floor your framing crew can start on

A price for the foundation work, written against your drawings, the engineer's design, and what the site itself turns out to need.

Send the plans

A boxed and braced platform ready to pour, pods and steel inside the timber boxing, paddocks, trees and hills beyond

Who this is for

You are pricing a house, or you have one consented and the slab is next in the programme. Framing waits on the floor, so the foundation sets the date the rest of the build counts from. A change to the design moves that date.

The start date waits on the consent, the engineer's final design and the council's inspection before the pour.

What we need from you

To price a foundation we need:

  • the plans, and the engineer's foundation design if there is one yet;
  • the geotechnical report for the section;
  • the site address, and anything we should know about getting onto the site;
  • the consent number once there is one, and who is holding the programme.

If the design is not final, say what is still open. A price written against a drawing that is about to change will change with it.

What you get back

You get our price. To check it, see the foundations we build: what the work involves, what the engineer decides and what moves the cost.

Beside the number, ask anyone who prices the job for:

  • the assumptions it rests on: which revision of the drawings, which geotechnical report, and what the building platform is taken to be;
  • who will hold the licence for the foundation work, and in which class, so you can look that person up on the public register before you sign;
  • what is excluded, and where the foundation scope stops, so the gap to the next trade shows while there is still time to close it.

What you are buying, beside the concrete

The stepped edge of a cured slab with its permanent edge form, grass and a fence beyond
  • Ready to frame. Square, level and clean, with nothing for your chippies to work around on day one.
  • A trade that manages itself. Set-out, boxing, steel, pods and the services coordinated before the pour, and the council's inspection booked and attended. You are not holding a gap in your programme while you chase somebody.
  • Bad news early. What the ground turns out to be, what the drawings leave open and what is missing, before it is cast in, while you can still act on it.
  • Our own remedials. If something is out, it is ours.

Every trade behind the foundation is booked against its date. When the foundation slips, it costs you the trades queued behind it.

A boom pump over a hilltop pour at dusk, the crew in hi-vis, the plain stretching below

Weigh a price against your programme. A subcontractor you have to manage costs you more than the difference in price, and none of that cost is on an invoice.

Who decides what

Most of a foundation is settled on paper before anyone is on site.

  • What the ground is, and what it will do under load: the geotechnical report.
  • The design, and any change to it: the engineer.
  • What the consent asks for, and when the work is inspected: the council.
  • Who may carry out or supervise the work, and what the owner is handed at the end: the licensing rules.

The ground comes first. A describes the land. Read what each category means and what decides the foundation type.

Then the engineer: the rib layout, the edge beams, the steel, the slab thickness, and whether that kind of slab suits the ground at all. Those stay the engineer's when the price moves. Compare pod rafts, waffle slabs and ring foundations as MBIE's guidance describes them.

Then the consent. It comes with the council's list of inspections, and nothing is poured until the pre-pour inspection is passed.

What we build

UF builds pod raft foundations for TC1 and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

Ultimate Foundations is based in Christchurch.

The managing director holds the licence for the foundation work: Foundations areas F1 and F2, BP127329.

See what goes into a pod raft foundation, in order, and what TC2 and TC3 mean for the foundation.

A boxed building platform covered in white insulation pods laid in a grid, houses and hills beyond

What moves the price

The price comes from your drawings and the site. Check what moves it before you price the house:

  • The perimeter. A long or broken outline is more edge beam for the same square metres, so the same floor area can be a different foundation.
  • Floor level against existing ground. How much cut and fill, and where the spoil goes.
  • Set-downs, thickenings and penetrations. Every one of them is formwork.
  • Access for the truck and the pump. How close they can get, and whether anyone is barrowing.
  • The engineer's design. Steel, slab thickness and beam sizes are the engineer's.
  • The ground. What it turns out to be, against what the report said it would be.
A cut through a floor slab where its top steps down. The thickness of a tile and the bed under it fills the step, so the finished tiled surface arrives level with the floor beside it. A dashed line runs across both to show the single finished level.

Two prices for the same house can differ because they assume different things. Compare the assumptions, starting with what each price leaves out.

Before you send the plans

Can you tell me the technical category from the address? It comes from that section's geotechnical report.

What do we get at the end? The paperwork the licensing rules require, and the record of what went into the floor.

How do I check you before I subcontract you? The company, the licence and the product certificates are all on public registers. Check us, or anyone else quoting your job.

What areas do you cover? Ask us about the site. We answer job by job, and travel is a factor in the price.

How long does it take? We will tell you for your job, with what it assumes.

Working with us

You hold the programme and the contract with your client. The foundation is one trade inside it, so settle these on paper before anyone is on site:

  • Changes go through the engineer. A change to the floor level, the cladding weight or the outline of the house is a change to the foundation, and the engineer signs it off.
  • The inspection before the pour is the council's. It is booked, and the pour waits for it. A step waiting on somebody else holds up every step after it, so each week ask which step the job is waiting on, and whose it is.
  • The scope, in writing. Write down what the foundation scope covers and where it stops, before the first truck. A programme usually slips in the gap between two trades.

When a client asks why the foundation costs what it does, or why the engineer will not drop the floor level, send them our guides. Every fact in them names its source and the date that source was read: how we write and check our guides.

Technical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guide