Ring foundations to NZS 3604

As at · 15 sources

What it is

A ring foundation is a perimeter concrete foundation: a concrete wall that runs round the outside of the house. MBIE's Canterbury guidance calls a house with a timber floor on a perimeter concrete foundation a :

MBIE's Canterbury guidance groups houses on the flat as Type A, a timber floor on piles only; Type B, a timber floor with a perimeter concrete foundation; and Type C, a concrete slab-on-grade. Types B and C are split by cladding: B1 and C1 for light or medium cladding such as weatherboard, and B2 and C2 for heavy cladding such as brick or concrete masonry veneer.1

NZS 3604 is the standard for timber-framed buildings. On this page it means NZS 3604:2011, which anyone can download free:

NZS 3604:2011 Timber-framed buildings is on the list of building standards that MBIE has funded “for free download” from Standards New Zealand.2

Where a ring foundation fits comes down to the ground. The standard's foundations are written for good ground, and MBIE's guidance says which Canterbury land that is likely to be, and which it is not:

MBIE's guidance says TC1 is generally regarded as the category most likely to be good ground. It says TC2 and TC3 fall outside the definition of good ground for standard residential construction, so their foundations are not within the scope of NZS 3604.3

On land, the council's own description allows standard foundations. On TC2 land, MBIE's guidance keeps a perimeter foundation wall for the firmest ground, and makes it an enhanced one:

Christchurch City Council describes TC1 land as land where future damage from liquefaction is unlikely, so standard foundations for concrete slabs or timber floors can be used.4On TC2 land, MBIE's guidance uses NZS 3604 timber piles or an enhanced perimeter foundation wall where the ground is above 300 kPa, the enhanced slab Options 1 to 4 or other specific design where it is above 200 kPa, and specific design below that.5

What TC3 land asks of a foundation is set out in TC3 foundations, to specific engineering design. The hills, rural land and non-residential land have no category, and there the foundation is designed for the site:

Land with no technical category covers non-residential urban properties, rural areas and hill areas, where, the council says, a site-specific foundation design has always been required.6

What the engineer decides

Whether the standard's own foundation details can be used at all, and if not, what goes in instead. That turns on the ground, so the investigation comes first, and it measures how much load the ground can carry:

On TC1 and TC2 land, MBIE's guidance expects a shallow investigation of the ground, with hand auger boreholes and a Scala penetrometer, to establish its bearing capacity; on TC2 land it says that work needs to be done under the guidance of a CPEng qualified engineer.7MBIE's guidance treats 300 kPa, for NZS 3604 foundations, and 200 kPa, for the TC2 slab options, as index values of ultimate bearing capacity, checked with a Scala penetrometer.8

Where good ground cannot be confirmed, the standard's foundation details are not the answer on their own. Any peat counts against it:

MBIE's guidance says that where good ground cannot be confirmed, the NZS 3604 concrete floor and foundation provisions should not be used without specific engineering design input, and that in many areas of greater Christchurch the good-ground provisions may not apply.9In Canterbury, MBIE's guidance changes the NZS 3604 list of ground that does not count as good ground so that it names peat of any kind, not only soft or very soft peat, so any peat takes a site outside it.10

Outside good ground, the foundation is by the engineer. Inside it, the engineer or designer on your plans still decides the wall, the footing and the steel.

What happens on site

The line of the ring is set out from the plans, the trench for the footing is dug to the depth the design gives, and the steel is placed and tied as it shows. Nothing is poured until the council has inspected:

Christchurch City Council's inspection called Foundation or Slab covers the pre-pour foundation, subfloor drainage and the pre-pour floor, and has to be done before concrete is poured.11

The wall is then poured and left to cure, and the floor inside goes in as the design shows it.

The law sets who may do or supervise this work, and what they hand over when it is done. The Foundations licence has separate areas of practice for foundation walls and for piles:

Foundation work on a house that needs a building consent is restricted building work, which a Licensed Building Practitioner licensed for that work must carry out or supervise, unless an owner-builder does it on their own home under the Act's owner-builder exemption.12The Foundations licence for Licensed Building Practitioners has two areas of practice: “Foundations 1: Concrete foundation walls and concrete slab-on-ground” and “Foundations 2: Concrete or timber pile foundations”.13When their part of the restricted building work is finished, each Licensed Building Practitioner who carried it out or supervised it writes a record of work, and gives one copy to the building owner and one to the council.14

What changes the price

The price comes from your plans, the geotechnical report and the design. What moves it:

  • The ground. How deep the footing has to go to reach ground that carries the load, and whether the standard's details can be used at all or the foundation is designed for the site.
  • The length and shape of the ring. The wall runs the whole outline of the house, so a long or complicated outline means more of it.
  • The house. Heavy cladding such as brick veneer, or a second storey, changes the wall and the footing the design calls for.
  • What sits inside the ring, and what it rests on.
  • The site. How machinery and concrete trucks get in, how much digging there is, and where the spoil goes.

What we need from you

To price a ring foundation we need:

  • the plans, and the engineer's foundation design if there is one yet;
  • the geotechnical report for the section;
  • the site address, and anything we should know about getting onto the site;
  • who the builder is, if you have one.

Frequently asked

Is a rubble ring foundation built to NZS 3604?

What an existing perimeter foundation is built of, and what it needs, is for an engineer who has seen it.

Can a ring foundation go on TC2 land?

MBIE's guidance keeps a perimeter foundation wall for the firmest TC2 ground, and makes it an enhanced one, as set out above. On ground that carries less, it points to its slab options or to a foundation designed for the site, and which of those goes in is the engineer's call. What they are is in TC2 foundations: pod rafts to the engineer's plans.

Is NZS 3604 changing?

Standards New Zealand has consulted on a draft revision:

Standards New Zealand's public consultation on DZ NZS 3604, the draft revision of NZS 3604 Timber-framed buildings, opened on 29 June 2026 and closed on 22 September 2026. When the consultation page was read on 19 November 2026, no publication date for the revised standard had been announced.15

A draft is not a standard. This page is about NZS 3604:2011.

What we do here

UF builds pod raft foundations for TC1 and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

Send the plans and the address, and the geotechnical report if there is one. We will tell you what the foundation on your section involves, what the engineer settles before anyone can price it, and which parts of the job are ours.

Sources

MBIE's Canterbury guidance, Part A, is published on building.govt.nz.

See also the technical category entry in the glossary.

  1. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 2.1 and Table 2.1. Checked . Read the source
  2. Standards New Zealand, Building-related standards (sponsored standards). Checked . Read the sourceSource: Standards New Zealand, standards.govt.nz. Crown copyright © Standards New Zealand, licensed under CC BY 4.0; quoted or restated in part. Licence terms
  3. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.1. Checked . Read the source
  4. Christchurch City Council, Technical categories information. Checked . Read the source
  5. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), Table 5.2. Checked . Read the source
  6. Christchurch City Council, Technical categories information. Checked . Read the source
  7. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.4.1 and Table 5.2. Checked . Read the source
  8. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.4.1. Checked . Read the source
  9. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 5.2. Checked . Read the source
  10. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.4.1. Checked . Read the source
  11. Christchurch City Council, Guide to Building Inspections (B-306), version 10 (last updated 15 June 2026), page 2 and pages 7 and 8, Foundation or Slab. Checked .
  12. Building Act 2004, and the Building (Definition of Restricted Building Work) Order 2011, versions as at 8 October 2026 and 15 January 2026, sections 84 and 90D; Order clauses 3 and 5. Checked .
  13. Licensed Building Practitioners, What do I need to show to get my Foundations licence (factsheet), version 2. Checked . Read the sourceSource: Licensed Building Practitioners scheme (MBIE), What do I need to show to get my Foundations licence (factsheet, version 2), lbp.govt.nz. © Crown copyright. Licence terms
  14. Licensed Building Practitioners, Construction process (restricted building work). Checked . Read the sourceSource: Licensed Building Practitioners scheme (MBIE), lbp.govt.nz. © Crown copyright. Licence terms
  15. Standards New Zealand, DZ NZS 3604 Timber-framed buildings, consultation page. Checked . Read the source
Type B1 / Type B2 (house)MBIE's Canterbury guidance names for a timber-framed house with a suspended timber floor on a perimeter concrete foundation. B1 has stucco, weatherboard or light texture cladding; B2 has brick or concrete masonry veneer.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read the guideTechnical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guideSpecific engineering designDesign where the design or design method is non-standard, outside the Acceptable Solution or Verification Method. It is usually done by a Chartered Professional Engineer.MBIE, The guide for Canterbury builders: Below-floor work, April 2013 · as at 15 September 2026Read the guide