Building a home: the ground, the foundation and the paperwork, in order
From buying the section to the paperwork at the end: what happens at each step, and who decides.
Send the plans
Start here
Step one: the section
A describes the land. You can look up an address on the category map, and the geotechnical report on your section is what counts. On a new subdivision lot, the council and your engineer decide what the map means for your lot.

Step two: the ground
An investigation of the ground goes into your geotechnical report. The geotechnical engineer decides what the ground is, and the foundation design starts from that report.
Step three: the consent
The council decides the building consent and the inspections that come with it. In Christchurch, its consent checklist asks about the ground.
Step four: the foundation
First the ground decides the foundation type, then the house does. After that, the engineer's design takes over.
UF builds pod raft foundations for TC1 and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.See how a pod raft foundation goes in, and what TC2 and TC3 mean for the foundation.

Step five: what you choose
Before the pour, choose what goes in your floor: a warm floor, the concrete as your finished floor, where the services run, a spare conduit, a floor with no steps. All of it stays for the life of the house.

Take four questions to your builder before the foundation is priced. See what moves the cost. A driveway is cheaper poured while the crew is already there for the floor.
Step six: the paperwork
The paperwork follows your foundation through consent: a certificate of work, a record of work, a producer statement and the code compliance certificate. See who issues each one, and check any contractor's licence yourself.