Block footings and retaining walls

As at · 18 sources

What it is

Concrete block turns up in two quite different jobs around a house: in a foundation wall that carries the house, and in a wall that holds back ground. This page covers both: what decides whether a foundation wall can be built from a standard's own details or is designed by an engineer for the site, who decides it for a retaining wall, and who to go to next.

A retaining wall has to meet the Building Code whether or not it needs a building consent, and its height alone does not decide whether an engineer designs it:

Exempt from a building consent or not, a retaining wall must still comply with the Building Code. MBIE Determination 2025/007 (5 February 2025) looked at a 1.2 m reinforced 20-series (190 mm) masonry block retaining wall with a PS1 and calculations, where the council's concern was surcharge on a neighbour's wall: the design was engineered even at that height because of the site.1

What the engineer decides

For a foundation wall under a house, the ground decides first. The standard's foundation details are written for good ground, and MBIE's guidance says which Canterbury land that is likely to be, and which it is not:

MBIE's guidance says TC1 is generally regarded as the category most likely to be good ground. It says TC2 and TC3 fall outside the definition of good ground for standard residential construction, so their foundations are not within the scope of NZS 3604.2MBIE's guidance says that where good ground cannot be confirmed, the NZS 3604 concrete floor and foundation provisions should not be used without specific engineering design input, and that in many areas of greater Christchurch the good-ground provisions may not apply.3

On land the guidance keeps a perimeter foundation wall for the firmest ground, as an enhanced wall, and on ground that carries less it points to its slab options or to a foundation designed for the site:

On TC2 land, MBIE's guidance uses NZS 3604 timber piles or an enhanced perimeter foundation wall where the ground is above 300 kPa, the enhanced slab Options 1 to 4 or other specific design where it is above 200 kPa, and specific design below that.4

On TC3 land the council's own description asks for a site-specific investigation and foundation design:

The council describes TC3 land as land where moderate to significant damage from liquefaction is possible in future significant earthquakes, and where a site-specific geotechnical investigation and a specific engineering foundation design are required.5

The house counts as well as the ground. Where the house or the ground takes a foundation outside the standard's details, it is :

MBIE's guide for Canterbury builders on below-floor work says repairing or rebuilding a timber-framed house generally needs specific engineering design if it is more than two storeys or 10 m high, or involves foundations in TC3.6

For a wall that holds back ground, your designer or engineer says which design applies to your wall. When a wall does not need a building consent is set out under the questions below, and MBIE lists who can advise on the consent:

MBIE lists who can advise whether building work is exempt from needing a building consent: the building consent authority (usually the council, which may charge), a registered architect, a chartered professional engineer, a registered building surveyor, a building consultant, a registered electrician, a licensed building practitioner holding the relevant licence class, a registered certifying plumber or drainlayer, and an independent qualified person.7

What MBIE's guidance does say is that sloping ground changes what a wall needs, and who should usually advise on a hillside:

MBIE's guidance says walls founded in sloping ground have much less lateral resistance and foundation bearing capacity available to them, that rule-of-thumb design methods for walls on level ground can be dangerously inadequate on sloping ground, and that appropriate drainage behind a wall is critical.8For hillside properties, MBIE's guidance says that in most cases a suitably qualified CPEng geotechnical engineer, or a suitably experienced engineering geologist, should be engaged to advise on site suitability, stability, foundations and retaining wall issues.9

What happens on site

The footing is dug and the wall is built as its design shows. For a retaining wall, the drainage behind it is part of the work, and the council inspects it before the pipe work is enclosed:

Christchurch City Council inspects retaining wall drainage and tanking, and the inspection must happen before pipe work is enclosed. On residential work, the licensed installer's PS3 must be on site for the inspector to review, or the inspection cannot be passed.10

For a foundation wall under a house, nothing is poured until the council has inspected:

Christchurch City Council's inspection called Foundation or Slab covers the pre-pour foundation, subfloor drainage and the pre-pour floor, and has to be done before concrete is poured.11

The records the council expects at inspection cover retaining walls too, and a change to the ground levels on the consented plans can mean a change to the consent:

Christchurch City Council's inspection guide lists a building location certificate among the minimum records at inspection, and says these records would also apply to secondary structures such as retaining walls.12Christchurch City Council's inspection guide gives substantive changes to ground levels that change foundations or retaining structures as an example of work that needs an amendment to the building consent.13

A foundation wall under a house is foundation work, which the law restricts, and the licensed practitioner who did or supervised it hands over a record of it:

Foundation work on a house that needs a building consent is restricted building work, which a Licensed Building Practitioner licensed for that work must carry out or supervise, unless an owner-builder does it on their own home under the Act's owner-builder exemption.14When their part of the restricted building work is finished, each Licensed Building Practitioner who carried it out or supervised it writes a record of work, and gives one copy to the building owner and one to the council.15

What changes the price

The price comes from the design, the ground and the site. What moves it:

  • The design. A wall designed for the site means the engineer's work, the calculations, and the council's consent where one is needed.
  • The wall: how high and how long it is, and what it holds back or carries.
  • The ground. The slope above and below the wall, and how far down the footing has to go.
  • What goes behind a retaining wall: the drainage, and any tanking the design calls for.
  • Getting to the wall. How blocks, steel, concrete and machinery reach it.
  • The inspections the consent calls for.

What we need from you

A wall is priced from its design, whoever builds it:

  • the plans, and the engineer's design for the wall if there is one;
  • the geotechnical report, where there is one;
  • the site address, and how to get to where the wall goes;
  • who the builder is, if you have one.

Frequently asked

It depends on the wall. The Building Act exempts two kinds of retaining wall:

Schedule 1 of the Building Act exempts from needing a building consent building work in connection with a retaining wall that retains no more than 1.5 metres depth of ground and supports no surcharge or other load beyond the load of that ground, such as the load of vehicles.16A separate exemption in Schedule 1 covers a retaining wall in a rural zone (not a rural residential area) that retains no more than 3 metres depth of ground, where the distance between the wall and any legal boundary or existing building is at least the height of the wall. It applies only where a chartered professional engineer did the design or has checked it, and the work follows that design.17

Whether your wall meets those conditions is for the council or your engineer to say, and who can advise on it is set out above. A wall that does not need a consent still has to meet the Building Code.

Who designs a retaining wall, and who checks one?

An engineer designs it where it needs designing, and the kind of engineer matters:

Engineering New Zealand says you need a geotechnical engineer to assess ground conditions and decide a suitable foundation design, and to design foundations and retaining walls, and a structural engineer to assess the safety of a structure such as a retaining wall. It links a search of the register of Chartered Professional Engineers, and says being a member of Engineering New Zealand does not mean an engineer is also a CPEng.18

Ask whether the engineer is chartered, and look them up on the register.

Is a block foundation the same as a retaining wall?

No. A block foundation wall carries a house; a retaining wall holds back ground. Which job a wall does, and what it needs to do it, is set by its design.

What we do here

UF builds pod raft foundations for TC1 and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

Send the plans and the address. We will tell you what the wall involves, where the foundation question stops and a retaining question starts, and which parts of the job are ours.

Sources

MBIE's Canterbury guidance, Part A, is published on building.govt.nz.

See also the specific engineering design entry in the glossary.

  1. MBIE, Determination 2025/007, sections 1 to 3. Checked . Read the source
  2. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.1. Checked . Read the source
  3. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 5.2. Checked . Read the source
  4. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), Table 5.2. Checked . Read the source
  5. Christchurch City Council, Technical categories information. Checked . Read the source
  6. MBIE, The guide for Canterbury builders, Below-floor work, April 2013, pages 6 to 8 and 20. Checked . Read the source
  7. MBIE, Building work that does not require a building consent, 6th edition, version 2 (January 2026), Ask for advice. Checked .Source: Ministry of Business, Innovation and Employment, Building work that does not require a building consent (6th edition, version 2, January 2026). © Crown copyright. Licence terms
  8. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 6.2.2. Checked .
  9. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 6.1. Checked .
  10. Christchurch City Council, Guide to Building Inspections (B-306), version 10 (last updated 15 June 2026), page 19, Drainage (includes retaining wall drainage). Checked . Read the source
  11. Christchurch City Council, Guide to Building Inspections (B-306), version 10 (last updated 15 June 2026), page 2 and pages 7 and 8, Foundation or Slab. Checked .
  12. Christchurch City Council, Guide to Building Inspections (B-306), version 10 (last updated 15 June 2026), page 23, records. Checked . Read the source
  13. Christchurch City Council, Guide to Building Inspections (B-306), version 10 (last updated 15 June 2026), page 5, amendments. Checked . Read the source
  14. Building Act 2004, and the Building (Definition of Restricted Building Work) Order 2011, versions as at 8 October 2026 and 15 January 2026, sections 84 and 90D; Order clauses 3 and 5. Checked .
  15. Licensed Building Practitioners, Construction process (restricted building work). Checked . Read the sourceSource: Licensed Building Practitioners scheme (MBIE), lbp.govt.nz. © Crown copyright. Licence terms
  16. Building Act 2004, version as at 8 October 2026, Schedule 1, clause 20. Checked . Read the source
  17. Building Act 2004, version as at 8 October 2026, Schedule 1, clause 41, with section 42A(1)(c). Checked . Read the source
  18. Engineering New Zealand, Find an engineer. Checked . Read the source
Technical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guideSpecific engineering designDesign where the design or design method is non-standard, outside the Acceptable Solution or Verification Method. It is usually done by a Chartered Professional Engineer.MBIE, The guide for Canterbury builders: Below-floor work, April 2013 · as at 15 September 2026Read the guide