Ground
The ground under your house comes first: what it is, who decides what it means, and which foundations it allows.
Send the plans
Start here
Start at the category on the map if you have an address, at new lots if you are buying on a new subdivision, and at the report if you have the geotechnical report.
The category on the map
A describes the land: how badly liquefaction could damage it in a future significant earthquake. See what TC1, TC2 and TC3 mean, and look up an address on the category map.
The geotechnical report on your section and your engineer's design decide what goes under your house. Where the ground could move, an engineer designs the foundation: see what liquefaction changes.

A new subdivision lot
The category map was not meant to be updated. On a new subdivision lot, the council and your engineer decide what it means for your lot.
Building numbers for the region
Building numbers for the region count consents, and a consent is an intention to build. See what the Canterbury building figures do and do not count.
Your geotechnical report
An investigation of the ground goes into your geotechnical report, and the foundation is designed from it. It is the one document in your stack about your own section: see what the rest of your paperwork does not tell you.
From the ground to the foundation
First the ground decides the foundation type, then the house does, and the engineer's design settles it: see what each foundation is. On a hill, the cut or fill, the water and the truck's way in change it too: see what a slope changes.
If you build new here, the lesson of the earthquakes is already in the design: see earthquakes and foundations.


