TC3 foundations, to specific engineering design

As at · 13 sources

What land means for a foundation, and how the engineers choose between the routes MBIE's guidance sets out.

TC3 describes the land

MBIE's Canterbury guidance puts residential land on the flat in greater Christchurch into technical categories, and TC3 is one of them. The council describes the land, and what it needs:

The council describes TC3 land as land where moderate to significant damage from liquefaction is possible in future significant earthquakes, and where a site-specific geotechnical investigation and a specific engineering foundation design are required.1
Close on edge insulation set against the timber boxing, a capped starter bar beside it and white pods below

The engineers choose the route

For new houses on TC3 land, MBIE's guidance offers three broad foundation families: deep piles, site ground improvement, and surface structures with shallow foundations.2 Each has its own conditions:

  • Deep piles, taken down to firm ground that will not liquefy, and always . MBIE's guidance says deep pile foundations always need specific engineering design.3 MBIE's guidance says deep piles aim for negligible settlement in small and large earthquakes, and are not suitable where major or severe global lateral movement is likely, or where there is no dense, non-liquefiable layer for them to bear on.4
  • Improving the ground first, so that a slab of the kind used on TC2 land can go on it. On TC3 land, site ground improvement aims to improve the ground so one of the TC2 slab options can be used, and MBIE's guidance says ground improvement that forms part of the foundation needs a building consent, and may need a resource consent as well.5
  • A shallow foundation that sits on the ground and can be brought back to level if the ground settles. MBIE describes surface structures as shallow-founded options that can be used on most TC3 sites without ground improvement or deep piles, and can be relevelled after future settlement; they are only for timber- or steel-framed houses with light roofs, light or medium wall cladding and regular plans.6

Type 2A and Type 2B on a quote

Type 2A and Type 2B are TC3 surface structures in MBIE's Canterbury residential guidance. They are not TC2 foundations.7

Ask which MBIE option is meant on any quote that calls one a TC2 foundation, and compare MBIE's labels side by side.

Reinforcing mesh on chairs over membrane with pink set-out marks, a paddock and mountains beyond

Look up the address, then read the report

The map gives an indication only, and it is not kept up to date:

The published technical category data describes itself as “the best information available at the time of publication on Canterbury Maps in 2017”, and says the categories “were intended to have a limited life and were not intended to be updated over time”.8

Look up an address on the category map, then go by the geotechnical report on your section and the engineer's design drawn from it: they decide what goes under the house.

Everything starts with the investigation

On TC3 land the investigation goes deep: MBIE's guidance says its scope is set by a CPEng geotechnical engineer, and generally expects at least two deep test points to 10–15 m where practical.9

The council needs the engineer's work with the consent application:

Where the foundations are specifically designed, Christchurch City Council's consent checklist for a house says structural calculations are required, and that they should include a producer statement for design (PS1).10
Two people at the edge of an excavation, an excavator working on the hill behind them

The route sets the order on site

The engineer's plans set the order. With deep piles, the piles go in and the floor slab is built on top of them. Where the ground is improved, that work comes before the slab, and the consent has to cover it.

A TC3 foundation may need to be relevelled one day, so what runs into the house has to allow for it:

For TC3 land, MBIE's guidance describes a TC2-type stiffened slab that can be relevelled and raised by jacks from outside, used with shallow ground improvement, and a relevellable concrete surface structure that needs specific design; services need flexible connections to survive future relevelling.11

What the programme waits on

The deep investigation comes first, then the design, then the consent. The consent asks for the engineer's calculations, and the ground work may need consents of its own. On site, the council inspects before the pour, and the engineer does too where the consent calls for it:

A council may make it a condition of the building consent that a chartered professional engineer monitors parts of the work and provides a PS4 producer statement; the guidance says the engineer who designed the work is often the best person to do it.12
A boxed platform ready to pour on a wide, flat rural section, trees along the boundary and a ute beyond

What moves the price

On TC3 land, these move the price:

  • The investigation. It goes deeper than on TC2 land, and its findings decide everything after it.
  • The route. Deep piles, improving the ground and a shallow foundation are different kinds of work, with different materials, machinery and people.
  • The engineering, and the council's review of it. Christchurch City Council's guide to building consent fees lists specialist reviews by a structural, geotechnical or fire engineer as a variable charge that depends on how complex the work is.13
  • The house. The shallow foundation route is only for lighter houses with regular plans, so heavy cladding, a heavy roof or an irregular plan changes the route.
  • The consents. Improving the ground needs consents of its own.
  • Getting onto the site. How close machinery and concrete trucks can get, and the earthwork the platform needs.

What we need from you

To price a TC3 foundation we need:

  • the plans, and the engineer's foundation design;
  • the geotechnical report for the section;
  • the site address, and anything we should know about getting onto the site;
  • who the builder is, if you have one.
A crew member in an Ultimate Foundations shirt checking the string line along the boxing, seen from behind

What we do here

UF builds pod raft foundations for TC1 and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

Send the plans and the geotechnical report, and we will tell you what a specific engineering design means for the foundation and the order of the work.

Sources

  1. Christchurch City Council, Technical categories information. Checked . Read the source
  2. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part C, Version 3a (April 2015), section 15.1.1 and Table 15.1. Checked . Read the source
  3. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part C, Version 3a (April 2015), section 15.2. Checked . Read the source
  4. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part C, Version 3a (April 2015), Table 15.1, sections 15.2 and 15.2.5. Checked . Read the source
  5. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part C, Version 3a (April 2015), June 2015 update to section 15.3. Checked . Read the source
  6. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part C, Version 3a (April 2015), section 15.4.1. Checked . Read the source
  7. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part C, Version 3a (April 2015), section 15.4.4. Checked . Read the source
  8. Environment Canterbury, MBIE Technical Categories dataset, description (data.govt.nz catalogue). Checked . Read the sourceSourced from Canterbury Maps and partners and licensed for reuse under the CC BY 4.0 licence (MBIE Technical Categories; item credit: Canterbury Earthquake Recovery Authority); quoted in part. Licence terms
  9. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.4.2. Checked . Read the source
  10. Christchurch City Council, Form B-062 Application checksheet, single residential dwellings, version 22 (last updated 16 December 2025), items 5a and 5b. Checked . Read the source
  11. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part C, Version 3a (April 2015), sections 15.3 and 15.4. Checked . Read the source
  12. MBIE, Certificates of work guidance (July 2013), On-site monitoring. Checked .Source: Ministry of Business, Innovation and Employment, Guidance on the use of Certificates of Work, Producer Statements, and Design Features Reports (July 2013). © Crown copyright 2013. Licence terms
  13. Christchurch City Council, Guide to building consent fees and charges, 2025/26. Checked . Read the source
Technical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guideSpecific engineering designDesign where the design or design method is non-standard, outside the Acceptable Solution or Verification Method. It is usually done by a Chartered Professional Engineer.MBIE, The guide for Canterbury builders: Below-floor work, April 2013 · as at 15 September 2026Read the guide