Getting in touch, and what to have ready

As at · 1 source

Ring or email the office, and have the plans and the geotechnical report ready when you do.

How to reach the office

Ask for Daniel Pickering, the managing director: he holds the licence for the foundation work, and the questions go to him.

There is no form on our website, and nothing here runs in your browser to watch you. Nothing here sends anything anywhere.

Ultimate Foundations is based in Christchurch.

UF builds pod raft foundations for and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.
A boom pump pouring a steel-and-pod floor on a rise while a client and a child watch from the boxing

What to have ready

The first conversation goes better when both people are looking at the same paperwork. Whoever prices your foundation will ask for these, so have them in one place:

  • The plans. The architectural drawings as they stand, and the engineer's foundation design if one has been drawn yet.
  • The geotechnical report for the section. See who writes one and what it settles.
  • The category the report gives, in the report's own words. See what the technical categories are.
  • The floor level on the plans, and anything the council has said about it for that section.
  • Where the consent has got to. Not lodged, lodged, granted, or granted with conditions, and the consent number once there is one.
  • The site address, and how a truck gets onto it. Access, services, levels, and anything awkward about the approach.
  • Who the builder is, if there is one yet, and who is holding the build programme.

If a piece does not exist yet, say so. The missing document is usually the one everything else is waiting on.

Reinforcing mesh on chairs over membrane with pink set-out marks, a paddock and mountains beyond

Who each document belongs to

Most of the paperwork a foundation is priced from belongs to somebody else:

  • The geotechnical report belongs to the geotechnical engineer who wrote it. It describes the ground under that section, and the foundation design is drawn from it.
  • The foundation design belongs to the structural engineer, who decides what the foundation has to be.
  • The consent, the conditions on it and the inspections it lists belong to the council.

What a date depends on

A foundation waits on other people. The ground has to be investigated, the engineer's design has to be in hand, and the consent has to be granted.

MBIE says a building consent comes with an inspection schedule listing the inspections the council will do, which may include inspections by others, such as engineers.1
A boxed and braced platform ready to pour, pods and steel inside the timber boxing, paddocks, trees and hills beyond

Sources

Technical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guide