A pod raft is a concrete slab poured over polystyrene pods, with concrete ribs between them.
One reinforced floor
Steel runs through the ribs and the slab, and the whole thing works as one reinforced floor sitting on the ground.
You may know it as RibRaft, which is Firth's brand name. Firth's RibRaft, Allied's SuperSlab and MBSS's MAXRaft are competing versions of the same type. The engineer's plans say which one goes on a site.

The engineer designs it for your ground
Everything structural is the engineer's: the rib layout, the edge beams, the steel, the slab thickness, and whether a pod raft suits the ground at all.
On land, MBIE's slab options are drawn up with a structural engineer overseeing them:
MBIE's guidance says the TC2 slab Options 1 to 4 are not expected to need specific engineering design, but structural engineers must oversee their documentation; they apply to simple plan shapes and carry limits on wall and roof cladding weight.1Pod raft systems carry either a CodeMark certificate or a BRANZ Appraisal, and each one sets out the scope its standard details cover.2 A certificate covers the product, used within its conditions, and the engineer's design covers your site.

On TC3 land
A pod raft goes on TC3 land only as part of a . The geotechnical and structural engineers choose the route, and one of their routes improves the ground first:
On TC3 land, site ground improvement aims to improve the ground so one of the TC2 slab options can be used, and MBIE's guidance says ground improvement that forms part of the foundation needs a building consent, and may need a resource consent as well.3How it goes in
The building platform is cleared and levelled to the heights on the plans, and the edges are boxed. The goes down, then the pods on their spacers, then the steel in the ribs and edge beams and the mesh over the pods. The plumber and the electrician set their pipes and ducts where the plans put them.
Nothing is poured until the council has inspected
In Christchurch, the inspection before the pour is the council's Foundation or Slab inspection:
Christchurch City Council's inspection called Foundation or Slab happens before the concrete is poured. For a slab on the ground the inspector checks, among other things, that the damp-proof membrane is lapped and taped, the reinforcing is placed and tied, the mesh is supported on chairs, and shrinkage control joints are formed; the council says these are minimum requirements, and if any is not met the inspection fails.4Then the slab is poured and left to cure.

What moves the price
The price comes from your plans and your site. These move it:
- The ground, and the investigation behind the design. The ground category sets how deep the investigation goes: MBIE's guidance expects a shallow investigation for a new house on TC1 or TC2 land, and on TC3 land a site-specific deep investigation with geotechnical analysis.5
- The outline of the house. Edge beams run the whole perimeter, so a long or complicated outline means more of them.
- The loads on the slab. Heavy cladding such as brick veneer, or a second storey, changes the steel and the beams the engineer specifies.
- The site. How machinery and concrete trucks get in, and how much earthwork the platform needs.
- What goes into the slab. Services, set-downs for showers, garage doors or brick veneer, and insulation where the drawings call for it.
Does a pod raft need insulation?
Your designer decides that when showing how the house meets H1, the energy-efficiency clause of the Building Code. Any insulation is shown on the consented drawings. Under H1/AS1, the slab counts in that calculation whether it is insulated or not:
Under the 6th edition a slab still has a construction R-value in the house's heat-loss calculation, taken from the Appendix E tables or from H1/VM1; the slab's area-to-perimeter ratio drives the result, and where edge insulation covers only part of the perimeter the value is pro-rated.6
What we need from you
To price a pod raft we need:
- the plans, and the engineer's foundation design if there is one yet;
- the geotechnical report for the section;
- the site address, and anything we should know about getting onto the site;
- who the builder is, if you have one.
What we do here
Send the plans. We will tell you what your section allows, what the engineer settles before anyone can price it, and what we need to price the work.
Sources
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), sections 5.2 and 5.3. Checked . Read the source
- MBIE Building CodeHub, register entries for pod raft floor systems. Checked .Source: Ministry of Business, Innovation and Employment, Building CodeHub (codehub.building.govt.nz), licensed under CC BY 4.0; restated in part. Licence terms
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part C, Version 3a (April 2015), June 2015 update to section 15.3. Checked . Read the source
- Christchurch City Council, Guide to Building Inspections (B-306), version 10 (last updated 15 June 2026), pages 7 and 8, Foundation or Slab. Checked .