Look inside a slab

As at

Turn a pod slab, tap any part and see where it sits before the concrete covers it.

Send the plans

A model of the slab shows here when the page can draw it.

Why does all of it go in before the pour?

The pour is the only day the inside of the floor is open. The pods are set out, the steel is tied, the pipes and conduits are threaded through, and then the concrete covers all of it.

What goes in then costs a length of pipe and a few minutes. Added later, the same thing is a saw cut, a patch and a line that shows for as long as the floor does.

A crew member tying steel over the pods, the boxing along the edge and hills beyond

What do you do with the drawings?

The drawings show every option on one slab, so you can see what there is to ask for. Ask your engineer which of them your section can take.

Look at the whole slab first, then at the part you care about. If you are building, take the list of parts to your builder and ask which of them are already on the plans. If a part is not, say so before the foundation is priced.

What we do here

UF builds pod raft foundations for and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

We lay out the foundation options for your section: what is possible on your ground, what is not, and who decides each one. Send plans if you have them, or an address and a rough idea if you do not.

Bring this slab to the options conversation, and we read it against your section.

Technical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guide