Get a quote for a foundation
As at · 3 sources
Send us your plans and your geotechnical report and we will price the foundation.
Where to send it

Who this is for
You are building your own home, or you are the builder pricing the house. Or you are the designer or engineer, and you need to know what a contractor will ask for.
What we need from you
For a price, we need:
- the plans, and the engineer's foundation design if there is one yet;
- the geotechnical report for the section;
- the site address, and anything we should know about getting onto the site;
- the consent number, if a consent has been granted;
- who the builder is, if you have one.
None of it has to be complete. Say what you have and what is still to come.
Chase the geotechnical report and the engineer's design first. The report belongs to the section, so a copy often exists before the house is drawn. See where to find your geotechnical report.

What you get back
Any foundation quote, whoever wrote it, should tell you:
- what is in the price and what is not, each one named;
- which drawings, which report and which design it was priced from;
- what would change it, and who would decide that change;
- who will hold the licence for the foundation work, and in which class, so you can check that person's licence.
The law puts one document in your hands at the end of restricted building work:
When their part of the restricted building work is finished, each Licensed Building Practitioner who carried it out or supervised it writes a record of work, and gives one copy to the building owner and one to the council.1You need it for the code compliance certificate, and it names the person who stands behind the work.
The order it happens in
The ground is investigated and a report is written. The engineer designs the foundation from that report. Then the consent is applied for and granted.
MBIE says a building consent comes with an inspection schedule listing the inspections the council will do, which may include inspections by others, such as engineers.2Only then are the drawings and conditions firm enough to build to. Pricing usually comes earlier. A price given before the design is final rests on assumptions: read them.
Ask whoever holds the step you are waiting on what the next step depends on: the engineer, the council or your builder.

The consent fee is the council's
The building consent is the council's charge, outside a foundation quote.
Christchurch City Council does not put a total cost on a consent when you lodge it: the charge is finalised once the consent has been granted. Inspections are a line in that charge, and more complex work means more of them.3Before you lodge in another council's area, ask that council what is payable at lodging, and what, if anything, follows once the consent is granted.
What moves the price
A foundation is priced from your drawings and your site. What moves it:
- The ground, and what the geotechnical report says has to be done about it.
- The engineer's design. It settles the steel, the beams and the thickness.
- The size and shape of the house. Edge beams follow the perimeter, so a long or broken outline means more of them.
- The loads on the floor. Heavier cladding, or a second storey, changes what the engineer specifies.
- The site itself: how machinery and concrete get in, and how much earthwork the platform needs.
- What goes into the slab: services, set-downs, and insulation where the drawings call for it.
Most of those are settled on paper before anyone is on site, and they decide the price.
Who you are dealing with
Ultimate Foundations is based in Christchurch.
UF builds pod raft foundations for and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.
See the foundations we build: what the engineer decides on each, and what happens on site. The legal name, the company number and the licence classes a foundation needs are all on public registers. Check us, or anyone quoting your job.
Working with your builder
If you have a builder, settle who is buying the foundation before anything is priced: your builder or you. That decides who is quoted, who is invoiced and whose programme the work sits in.
If you are the builder, say who holds the programme, and whether the foundation design is final or still moving.
Sources
- Licensed Building Practitioners, Construction process (restricted building work). Checked . Read the sourceSource: Licensed Building Practitioners scheme (MBIE), lbp.govt.nz. © Crown copyright. Licence terms
- MBIE, Guide to applying for a building consent and code compliance certificate, Third edition (October 2022), Step 5, Inspections and code compliance certificate. Checked .Source: Ministry of Business, Innovation and Employment, Guide to applying for a building consent and code compliance certificate (October 2022). © Crown copyright. Licence terms
- Christchurch City Council, Guide to building consent fees and charges, 2025/26. Checked . Read the source