Liquefaction, and what it changes about your foundation
As at · 6 sources
Ultimate Foundations ·
The short answer
Liquefaction is the reason Canterbury has foundation categories at all, and the reason a house here is not designed the way the same house would be elsewhere. The one consequence that reaches you is this: ground that could move takes a section outside the standard rules, and once that happens an engineer designs your foundation rather than a standard selecting it.
Key points
- Ground that could move is outside "good ground", and outside good ground the standard foundation rules stop applying.
- Outside those rules, a foundation is designed for your section rather than chosen from a standard. That is the real consequence, and it reaches the price and the programme.
- The map is where the conversation starts. The investigation on your own section is what settles it, and it can land either way.
Why does Canterbury have ground categories at all?
Because of what the ground did, and what it could do again.
The describe how badly the land could be damaged in a future significant earthquake, and they exist only for residential land on the flat in greater Christchurch. What each one means, and where to look yours up, is set out on technical categories: TC1, TC2 and TC3 in plain English.
What matters here is the thing underneath the categories. They are a statement about whether the ground can move — and movement is what a foundation is designed against.
What does "good ground" have to do with it?
Everything, and it is the hinge the whole subject turns on.
Building rules are written for ground that behaves. Ground that could foreseeably move is excluded from that definition — and in Canterbury that exclusion is doing a lot of work.
MBIE's guidance says TC1 is generally regarded as the category most likely to be good ground. It says TC2 and TC3 fall outside the definition of good ground for standard residential construction, so their foundations are not within the scope of NZS 3604.1So the category is not a label describing your house. It is a statement about whether the ordinary rules apply to your section at all.
In Canterbury, MBIE's guidance changes the NZS 3604 list of ground that does not count as good ground so that it names peat of any kind, not only soft or very soft peat, so any peat takes a site outside it.2What actually changes when the standard rules stop applying?
The foundation stops being selected and starts being designed.
MBIE's guidance says that where good ground cannot be confirmed, the NZS 3604 concrete floor and foundation provisions should not be used without specific engineering design input, and that in many areas of greater Christchurch the good-ground provisions may not apply.3That is the whole consequence, and it is worth sitting with. On ground inside the standard, a foundation can be picked from a table. Outside it, an engineer works out what your section needs — and what they work out is what gets built, priced and inspected.
On TC2 land, MBIE's guidance sets out enhanced slab options rather than a standard NZS 3604 slab, so the ground category changes the slab being priced.4Which means the ground is settled before anybody discusses what you want in the floor. Not because your wishes do not matter, but because they are asked and answered against a design that already exists.
How much investigation will your section need?
More, the further the ground is from behaving.
The ground category sets how deep the investigation goes: MBIE's guidance expects a shallow investigation for a new house on TC1 or TC2 land, and on TC3 land a site-specific deep investigation with geotechnical analysis.5This is the part that surprises people: the investigation is not a formality and it is not the same job everywhere. A deeper one costs more, takes longer, and happens before a foundation can be designed — so it sits early in a programme rather than late.
Can the map be wrong about your section?
The map is not wrong so much as it is not about your section.
MBIE's guidance says that where damage to the land or foundations is greater than TC2 implies, the TC3 approach applies; and that on TC3 land a deep investigation by a CPEng geotechnical engineer may show that the site will behave in a way that makes TC2 foundation solutions suitable, with specific design on that basis if the council approves it through the building consent.6Read that carefully, because it runs both ways. An investigation can find a section behaves better than its category suggests, and it can find the land has done worse than the category implies. Both happen, and neither is decided by a map or by anybody quoting your job.
So the useful posture is not to argue with the category. It is to get the investigation done, early, and design to what it finds.
What should you do about it?
Three things, in this order.
Find out what the report says, not what the map says. If there is a geotechnical report for the section, it is the document that governs. What a geotechnical report says, and what it does not sets out what to look for in one.
Expect the engineer to lead. On ground outside the standard rules, the foundation is their design. A contractor builds it; a contractor does not choose it.
Ask early about what you want in the floor. Heating, a finished concrete surface, where the services run — those are still choices, and on ground like this they are made with the engineer rather than around them. What you can have in the floor of your house is the list; the answer for your section comes from the design.
What might your ground say about it?
That some of what you had in mind is not available here, and that is a real answer rather than a brush-off.
If you are told no, ask who decided. The geotechnical engineer, the structural engineer, the council and the build programme are four different answers, and only some of them are fixed. On ground that can liquefy, more of them are fixed than elsewhere — but not all of them, and the difference is worth knowing before you accept a no.
Who to contact
- A geotechnical engineer
- What the ground under your section is, and what it will carry. They investigate it and write the report the foundation is designed from.
- The engineer who designs your foundation
- What goes under the house, and why. Thickness, steel, beams and the system itself are settled here.
- Your council
- Whether the work needs a building consent, what has to be shown, and when it is inspected.
- The Licensed Building Practitioners register
- Whether the person doing restricted building work holds a licence for it. It is a free public search and it takes a minute.
- Us
- What we would build, what it would cost, and what we would need from you before we could start.
If you are told something is not possible, it is always worth asking which of these decided it. The ground and the Code are fixed. A design and a programme sometimes are not.
What we do here
Tell us the address and send the geotechnical report if there is one. We will tell you what it means for the foundation, what is still open, and what your engineer will want to settle before anything can be priced.
Sources
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.1. Checked . Read the source
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.4.1. Checked . Read the source
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 5.2. Checked . Read the source
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 5.3.1. Checked . Read the source
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), Table 5.2. Checked . Read the source
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.3. Checked . Read the source