Talk to a foundation specialist
We lay out the foundation options for your section, read against your ground.
An address and a rough idea of the house is enough to start. The first conversation about your section is free, by phone or in person, and it is never charged later or added to a quote. It is not a site visit, a design or a written report.
Start the conversation
Say where the section is and roughly what you are thinking of building, and send whatever exists — plans in any state, the geotechnical report if there is one. If nothing exists yet but the address, that is a fine place to start.
Who this is for
This page is for the person with a section and a set of questions that do not have a trade attached yet: what could the floor of this house actually be, what does this ground allow, and who decides which. You may have finished plans, or nothing but an address and a rough idea of the house. Either way you are early, and early is the useful time to talk — most of what a floor can be is settled before the foundation is designed, and the options are easiest to keep open while nothing is drawn.
That is what the options conversation is for. We lay out the foundation options for your section: the things a concrete floor can be — heated, finished as the floor you walk on, step-free, with the services and a spare conduit cast in — read against your ground rather than in general. It is a conversation, not a design. The engineer designs your foundation and the council checks that design, and neither of those happens in a conversation.
What we need from you
Plans, if they exist, in whatever state they are in — a sketch is useful, a consented set is useful, and so is anything in between. The geotechnical report, if the section has one; if it does not, say so, because knowing it is still to come is itself part of the answer.
Nothing has to be decided before you get in touch. The conversation is at its most useful before things are settled, while the options are still open and the plans can still carry them.
What you get back
What is possible on your ground, what is not, and who decides each one. Those are different kinds of answer, and the conversation keeps them apart.
- What is possible. Which of the things a floor can be are open on ground like yours, and what each one needs settled — on the plans, with the engineer, or before the pour.
- What is not, and who says so. Where the answer is no, it comes with a name attached: the geotechnical report, the engineer's design, the Building Code or the build programme. Those are different kinds of no, and only some of them are fixed.
- What to raise next, and with whom. Which document to chase first, what belongs on the plans before anything is drawn around it, and which questions are the engineer's and the council's rather than anyone else's.
What you will not get is a verdict on your section. What your ground allows is settled by its geotechnical report and by the engineer who designs from it, and nothing said in a conversation stands in for either.
What the options conversation is
A house carries hundreds of decisions, and the lists people are handed are short so that the build keeps moving. That shortening is mostly a kindness — nobody finishes a build by weighing every option — but the floor is the one place it can cost you, because the floor is poured once and everything in it is decided before that morning.
What you can have in the floor of your house is the long list. The options conversation is that list read against your section: which of it depends on your ground and how you would find out, which of it has to be on the plans early, and which of it is not yours or ours to decide at all.
What it is not
- Not a reading of your ground. What your section is, and what it will do under load, comes from its geotechnical report — what a geotechnical report says, and what it does not — not from an address or a conversation.
- Not the engineer's design, and not a prediction of what it will say. The design, and any change to it, stays the engineer's.
- Not the start of a job. A conversation settles what to ask and who to ask it of; the site, the report and the engineer settle the rest.
You do not need a builder yet
You do not need to have chosen a builder to have this conversation, and having one changes nothing about it except who else is in the room. Early on, many people do not yet know how they will build — with a building company, with an independent builder, or running the project themselves. The options conversation comes before that fork, because what goes into the floor belongs on the plans whichever way you build.
If you have a builder, bring them in, or take what comes out of the conversation to them. The decisions that survive are the ones that end up on the plans rather than in anyone's memory.
Working with your builder
If you already have a builder, nothing about this conversation goes around them. A builder's short list is what keeps a build moving, and the point of talking early is not to second-guess it — it is to make sure the floor decisions that cannot be changed later are raised while they can still be raised. Bring your builder into the conversation, or take what comes out of it to them: either works, and what matters is where it lands, which is on the plans.
Responsibilities stay where they belong. Anything that changes the foundation goes through the engineer, and what the consent asks for is the council's — the conversation moves none of that, whoever is in it.

