What the Canterbury building figures do and do not count

As at

The short answer

Building numbers get quoted a lot — in the news, by agents, in sales conversations. They are genuinely useful, and they are almost always read as something they are not. The published figures count building consents and the dwellings on them. A consent is an intention to build. It is not a start, it is not a finish, and nothing published counts the houses that actually get completed. This page sets out what the figures do count, what they leave out, and what is not published at all, so a number you are handed can be read for what it is.

Key points

  • A consent is permission to build, not a house. Nothing published counts the houses that get finished.
  • The headline count is of dwellings, not consents. One consent can cover many.
  • Canterbury the region, Greater Christchurch and Christchurch City are three areas with three different numbers, and no total is published for the middle one.

No. A consent is permission, and the published data reflects an intention to build. Some consented work starts late, some is staged over a long period, and some never starts at all. A separate measure estimates the value of work actually put in place, which is a different thing counted a different way.

So a rise in consents is a rise in intentions. It tells you what is planned, not what is happening on the ground this month.

Usually for a stand-alone house, and often not otherwise. The published count is of new dwelling units, not of consents — the publisher says so in as many words — and the number of consents is usually lower, because one consent can cover more than one dwelling.

It matters most where the building is densest. An apartment building or a retirement village commonly runs across several staged consents, issued in different months, with the units counted once. So a single large project can show up in more than one month's figures without the dwelling count double-counting it, and a quiet month followed by a loud one may be one project, not a change in the market.

Alterations and additions are counted differently again: there the published number is the number of consents, not units, with no floor area, and the two measures are not added together.

Several things, each of which changes how a total should be read:

  • Work that needs no consent. If it does not require a consent it is not in the data.
  • Consents that are predominantly for demolition.
  • Work below a low minimum value, which is excluded by design.
  • The cost of the land. The value recorded is the estimated cost of the building work, so a consent value is not what the finished property is worth.

The publisher also warns against leaning on building-type data for small geographic areas, where errors and omissions that do not matter nationally can matter a great deal.

Which Canterbury are we talking about?

This is the one that causes the most trouble, because three different areas share the same shorthand. Canterbury the region, Greater Christchurch, and Christchurch City are three different areas with three different numbers, and they are not interchangeable.

Greater Christchurch is the sharpest trap: no Greater Christchurch consents total is published at all. Any figure you are shown for it is somebody's sum of territorial authorities, and it should say whose and which. If it does not, you cannot tell what has been added together.

Do the figures say who built the houses?

No, and this surprises people. There is a series that splits consents by sector, but what it classifies is the owning or investing party — a household, a business, a government body — not the builder. A house consented by a household may be built by any firm at all. That series is also published nationally rather than by district.

What is not published at all?

The absences are as useful as the figures, because they tell you which questions cannot be answered from published data no matter who is quoting it:

  • No series counts completed dwellings in Canterbury. The data counts consents, and finished houses are not counted at all.
  • No distribution of dwelling units per consent is published, for Canterbury or nationally, so you cannot work out how many projects sit behind a dwelling count.
  • No official split between group-home builders and independent builders.
  • No regional building cost index. The published index is national, so a reported rise in building costs is not a Canterbury figure.

Each of those is an absence we went looking for. If someone quotes you one of them, ask where it came from, because it did not come from the official series.

So how should a building number be read?

As an intention, for a named area, over a named period, counted in a stated unit — and with the question of who added it up. A figure that does not say which of the three Canterbury areas it covers, or whether it is counting consents or dwellings, is not wrong so much as unreadable.

Who to contact

A geotechnical engineer
What the ground under your section is, and what it will carry. They investigate it and write the report the foundation is designed from.
The engineer who designs your foundation
What goes under the house, and why. Thickness, steel, beams and the system itself are settled here.
Your council
Whether the work needs a building consent, what has to be shown, and when it is inspected.
The Licensed Building Practitioners register
Whether the person doing restricted building work holds a licence for it. It is a free public search and it takes a minute.
Us
What we would build, what it would cost, and what we would need from you before we could start.

If you are told something is not possible, it is always worth asking which of these decided it. The ground and the Code are fixed. A design and a programme sometimes are not.

What we do here

No market figure decides what goes under a house. That is settled by the ground, the engineer's design and the council.

If you are building in Canterbury and want to know what the ground under your own section means for the foundation, tell us the address. A figure for the region says nothing about one site.

Sources

The building consent figures and their methodology are published by Statistics New Zealand at stats.govt.nz, with the definitions and the published warnings in the building consents documentation there.