Building on a new subdivision lot: the map, the reports and the council
As at · 17 sources
Ultimate Foundations ·
The short answer
The data behind the map says the categories were not intended to be updated over time, so what the map means for a lot made since is a question for the council and your engineer, not the map. MBIE's guidance on subdivisions says a subdivision consent application is supported by its own geotechnical report, and it sets a minimum investigation at each house site at the building consent stage. Ask the council and your engineer about both before you commit.
Key points
- The published technical category data describes itself as “the best information available at the time of publication on Canterbury Maps in 2017”, and says the categories “were intended to have a limited life and were not intended to be updated over time”.1
- MBIE's guidance on subdivisions in Canterbury says a subdivision consent application is supported by geotechnical investigations and a stand-alone geotechnical report, combining factual and interpretive information, prepared by a Chartered Professional Engineer (CPEng) with competence in geotechnical engineering. The report must identify the likely requirements for constructing buildings for liquefaction and lateral spread, and address the ground's other aspects, such as soil types, bearing capacity, settlement and stability.2
- For the building consent stage, MBIE's guidance on subdivisions says the density and depth of investigation will vary with the information already available from earlier stages. On TC1- and TC2-like land, its guidelines require at least a shallow investigation at each house site, with at least four test locations per house site; on TC3-like land, deep investigations and liquefaction assessment follow MBIE's Part C.3
Why might the technical category map say nothing useful about a new lot?
Because the data behind it was not meant to be kept up to date. It describes itself as the best information available when it was published, and says the categories were not intended to be updated over time, as the key points above quote. The categories were set after the earthquakes, from what liquefaction could do to residential land on the flat in greater Christchurch:
The Government announced TC1, TC2 and TC3 in October 2011 as new foundation design categories for Canterbury.4 The technical categories were set from the land deformation that liquefaction is expected to cause in design-level earthquakes, for residential land on the flat in greater Christchurch. They describe the land, not a foundation product. What that means for a particular section comes from its geotechnical report.5What the map shows for a lot made since, and what the council applies to that lot, is for the council and your engineer to say.
What does N/A mean on the technical category map?
N/A means no technical category was given. For non-residential properties in urban areas, properties in rural areas or beyond the land damage mapping, and properties in the Port Hills and Banks Peninsula, Property Search on Canterbury Maps shows the category as not applicable, and says normal consenting applies:
For a property with no category, Property Search explains that it has not been given one: non- residential properties in urban areas, properties in rural areas or beyond the extent of land damage mapping, and properties in the Port Hills and Banks Peninsula are not given a technical category, and normal consenting procedures apply there.6The council's own page says what that has meant for foundations there:
Land with no technical category covers non-residential urban properties, rural areas and hill areas, where, the council says, a site-specific foundation design has always been required.7And MBIE's guidance says the usual consent process on land with no category can mean an engineer:
MBIE's guidance says normal consenting applies to land without a category, which may mean engaging a geotechnical engineer.8If the map shows N/A for a lot you are looking at, ask the council what applies to it, and ask your engineer what they will need to investigate.
What is a subdivision's geotechnical report?
In MBIE's guidance on subdivisions, it is the stand-alone geotechnical report that supports the application for the subdivision consent. The guidance, quoted in the key points above, says who prepares it and what it covers: a chartered professional engineer with competence in geotechnical engineering, and the likely requirements for building on the land. "Likely" is the word to notice. NZGS and MBIE's guidance on investigations calls it prudent to tie a report to the development it was produced for:
NZGS and MBIE's guidance on geotechnical investigations says it is “prudent to tie the report to the scope of development that it was originally produced for, and to point out that any liability is only to the original commissioner of the report, not to subsequent users”.9Does the subdivision's report cover my house?
MBIE's guidance on subdivisions sets a minimum investigation at each house site at the building consent stage, whatever was done for the subdivision, as the key points above quote: shallow testing on TC1- and TC2-like land, and deep investigation and a liquefaction assessment on TC3-like land. What the earlier stages found can change the density and depth of the investigation at the house site, but the guidance keeps the minimum there.
Where the ground's bearing capacity is estimated from Scala penetrometer tests, MBIE's guidance singles out fill that was not engineered, and peat:
MBIE's guidance says a bearing capacity estimated from Scala penetrometer results must be adjusted for the soil type, the geometry of the foundation and the depth of the water table, and that peat deposits and non-engineered fill must always be given due regard.10So ask the engineer whether any part of the lot was filled, and whether the fill was engineered.
Which one decides the foundation: the map, the subdivision's report or the investigation at your house site?
None of them on its own: your engineer's design decides the foundation, from the geotechnical work on the ground, and the council checks the design before it grants the building consent. Which reports the design rests on for your lot is the engineer's work. What the guidance quoted on this page says of each:
- The technical category map. Its data describes itself as the best information available when it was published, and says the categories were not intended to be updated over time.
- The subdivision's geotechnical report. MBIE's guidance on subdivisions says it supports the subdivision consent application, is prepared by a chartered professional engineer, and identifies the likely requirements for building on the land.
- The investigation at your house site. MBIE's guidance on subdivisions sets a minimum at each house site at the building consent stage, whatever was done for the subdivision.
How do I get the geotechnical report for a new lot?
Ask before you commit. Ask the council what it holds for the lot, and ask your engineer what they need. Have your lawyer or conveyancer read the title with you, because the title is where the rights and restrictions that apply to the land are recorded:
LINZ describes a record of title as an electronic land record, a PDF, that proves ownership of the land and shows the rights and restrictions that apply to it. Interests are listed near the bottom with their instrument numbers: for example fencing covenants, easements, access and land restrictions, and mortgages.11What does the council need before you build on a new lot?
Ask the council before the design is finished. Christchurch's consent checklist for a single house, which is not written for new lots in particular, asks for a geotechnical investigation, and for a foundation that is , calculations with a producer statement for the design:
Christchurch City Council's consent checklist for a house asks for a geotechnical investigation (a ground conditions report), and says the level of investigation will vary with the type of building and where the property is.12 Where the foundations are specifically designed, Christchurch City Council's consent checklist for a house says structural calculations are required, and that they should include a producer statement for design (PS1).13What the council applies to a new lot, including one the map shows as N/A, is for the council to say. For Selwyn and Waimakariri, ask the council's building team what it needs for a house on the lot.
What does this mean for choosing a builder and a foundation?
Price the engineer's design, not the map. The foundation comes from the geotechnical report and your engineer's design, not from the map, a brochure or the lot next door, so ask each builder to price that design. The ground can change what is being priced:
On TC2 land, MBIE's guidance sets out enhanced slab options rather than a standard NZS 3604 slab, so the ground category changes the slab being priced.14MBIE's checklist for people having building work done says to compare like with like:
MBIE's checklist for people having residential building work done says to get “detailed quotes (not estimates)”, and to compare the same scope, materials and fixtures across quotes.15The same checklist says to be clear about who does what:
MBIE's checklist for people having residential building work done says “Building projects do not run themselves”, and to be clear “about who is doing the building work and who is responsible for making design and change decisions”.16When a building contractor has to give you the checklist is set by law:
Under the Building Act and the Building (Residential Consumer Rights and Remedies) Regulations 2014, a building contractor must give each client the prescribed checklist, with the prescribed disclosure information, before they enter into a residential building contract where the price for the building work is $30,000 or more including GST, or where the client asks for the checklist and the disclosure information.17What the investigation involves, and who writes the report, is in Your geotechnical report: what it is and what it decides. How the ground narrows the choice of foundation is in Foundation types and what decides them, and what the categories mean is in Technical categories: TC1, TC2 and TC3 in plain English.
The geotechnical report and your engineer decide the foundation for your lot.
Who to contact
- A geotechnical engineer
- What the ground under your section is, and what it will carry. They investigate it and write the report the foundation is designed from.
- The engineer who designs your foundation
- What goes under the house, and why. Thickness, steel, beams and the system itself are settled here.
- Your council
- Whether the work needs a building consent, what has to be shown, and when it is inspected.
- The Licensed Building Practitioners register
- Whether the person doing restricted building work holds a licence for it. It is a free public search and it takes a minute.
- Us
- What we would build, what it would cost, and what we would need from you before we could start.
If you are told something is not possible, it is always worth asking which of these decided it. The ground and the Code are fixed. A design and a programme sometimes are not.
What we do here
This page describes the map, the reports and the council's part on a new lot, not our work there. What we build is set out on the foundation pages.
Tell us which lot, and send the subdivision's report if you have it. We will tell you what that report covers, what it does not, and what is usually still to be found out.
Sources
To look up an address, use Property Search on Canterbury Maps. MBIE's Canterbury guidance, Part D on subdivisions among it, is published on building.govt.nz.
See also the technical category entry in the glossary.
- Environment Canterbury, MBIE Technical Categories dataset, description (data.govt.nz catalogue). Checked . Read the sourceSourced from Canterbury Maps and partners and licensed for reuse under the CC BY 4.0 licence (MBIE Technical Categories; item credit: Canterbury Earthquake Recovery Authority); quoted in part. Licence terms
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part D, Guidelines for the geotechnical investigation and assessment of subdivisions in the Canterbury region, Version 2 (December 2012), sections 16.1 and 16.5. Checked . Read the source
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part D, Guidelines for the geotechnical investigation and assessment of subdivisions in the Canterbury region, Version 2 (December 2012), section 16.8. Checked . Read the source
- New Zealand Government, New foundation design categories for Canterbury (media release). Checked . Read the source
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.1. Checked . Read the source
- Canterbury Maps, Property Search. Checked . Read the source
- Christchurch City Council, Technical categories information. Checked . Read the source
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.1 and section 5.1. Checked . Read the source
- NZGS and MBIE, Earthquake geotechnical engineering practice, Module 2, Geotechnical investigations for earthquake engineering, November 2021, section 5.1.5, Limitations. Checked .Source: New Zealand Geotechnical Society and Ministry of Business, Innovation and Employment, Earthquake geotechnical engineering practice, Module 2 (November 2021), reproduced in part with the copyright owner's authorisation. Licence terms
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.4.1. Checked . Read the source
- Toitū Te Whenua Land Information New Zealand (LINZ), What's on a record of title, last updated 20 January 2026. Checked . Read the source
- Christchurch City Council, Form B-062 Application checksheet, single residential dwellings, version 22 (last updated 16 December 2025), items 5a and 5b. Checked . Read the source
- Christchurch City Council, Form B-062 Application checksheet, single residential dwellings, version 22 (last updated 16 December 2025), items 5a and 5b. Checked . Read the source
- MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 5.3.1. Checked . Read the source
- The checklist in Schedule 2 of the Building (Residential Consumer Rights and Remedies) Regulations 2014, as MBIE publishes it, step 4. Checked .Source: the prescribed checklist, Building (Residential Consumer Rights and Remedies) Regulations 2014, Schedule 2, legislation.govt.nz. Licence terms
- The checklist in Schedule 2 of the Building (Residential Consumer Rights and Remedies) Regulations 2014, as MBIE publishes it, step 2. Checked .Source: the prescribed checklist, Building (Residential Consumer Rights and Remedies) Regulations 2014, Schedule 2, legislation.govt.nz. Licence terms
- Building Act 2004, and the Building (Residential Consumer Rights and Remedies) Regulations 2014, versions as at 8 October 2026 and 15 January 2026, section 362D; regulations 4 and 5, and Schedule 2. Checked . Read the source