Pod rafts, waffle slabs and ring foundations: what each is, and what decides between them

As at · 13 sources

The short answer

A pod raft and a waffle slab are concrete floors that sit on the ground, built over polystyrene with concrete ribs. A ring foundation, as this page uses the words, is the perimeter concrete foundation of a house with a timber floor. Which one goes under a house is not a matter of preference: the ground, and its , decide which foundations MBIE's guidance allows, and the engineer's design settles the one that goes in.

Key points

  • The four TC2 options in MBIE's guidance are Option 1, a reinforced NZS 3604 slab on a compacted gravel raft; Option 2, a thick slab over the existing soil; Option 3, a grid of beams with a slab, where the hardfill under the slab can be replaced with polystyrene pods; and Option 4, a waffle slab over the existing soil.1
  • MBIE's Canterbury guidance groups houses on the flat as Type A, a timber floor on piles only; Type B, a timber floor with a perimeter concrete foundation; and Type C, a concrete slab-on-grade. Types B and C are split by cladding: B1 and C1 for light or medium cladding such as weatherboard, and B2 and C2 for heavy cladding such as brick or concrete masonry veneer.2
  • On TC2 land, MBIE's guidance uses NZS 3604 timber piles or an enhanced perimeter foundation wall where the ground is above 300 kPa, the enhanced slab Options 1 to 4 or other specific design where it is above 200 kPa, and specific design below that.3
  • For new houses on TC3 land, MBIE's guidance offers three broad foundation families: deep piles, site ground improvement, and surface structures with shallow foundations.4

What is the difference between a pod raft, a waffle slab and a ring foundation?

A pod raft is a slab poured over polystyrene pods, with concrete ribs between them. It is a type of foundation, not a brand. RibRaft is Firth's brand name for Firth's own system, and Firth's RibRaft, Allied's SuperSlab and MAXRaft are systems an engineer's plans may specify for a pod raft.

A waffle slab is the name MBIE's guidance gives its TC2 Option 4: a slab over the existing soil, with polystyrene and ribs under it.

MBIE's TC2 Option 4 is a waffle slab over the existing soil, and needs an ultimate bearing capacity of at least 200 kPa under its polystyrene and ribs; the reinforcing MBIE shows for it is not sufficient for a two-storey house with brick veneer.5

Option 3 in MBIE's guidance is related: a grid of beams with a slab, where the hardfill under the slab can be replaced with polystyrene pods, as the key points above set out. Whether a system named on a set of plans is one of MBIE's numbered options, or a proprietary system with its own certificate, is on the engineer's drawings. Each proprietary system carries its own scope:

Pod raft systems carry either a CodeMark certificate or a BRANZ Appraisal, and each one sets out the scope its standard details cover.6

A ring foundation is different in kind. The floor inside it is timber, and the concrete runs round the edge of the house. In MBIE's guidance, quoted in the key points above, that house is a . What happens inside and under the ring is set by its design.

Two sections side by side. On the left, concrete runs across the whole footprint and is itself the floor, thickened where it meets the ground at each edge. On the right, concrete runs only at the edges, and the floor between them is timber on joists with a ventilated space beneath it.

Which of them goes on TC1, TC2 and TC3 land?

It depends on what the investigation finds the ground will bear, not on the category alone. On TC1 land, MBIE's guidance works from the bearing capacity:

On TC1 land, MBIE's guidance accepts NZS 3604 timber piles or tied NZS 3604 concrete slabs where a shallow investigation shows an ultimate bearing capacity above 300 kPa; between 200 and 300 kPa it points to the TC2 slab options or other specific design, and below 200 kPa, or where there is peat, to specific design.7

On TC2 land, as the key points above set out, the guidance keeps an enhanced perimeter foundation wall for the firmest ground, and uses the enhanced slab options, the pods of Option 3 and the waffle slab of Option 4 among them, where the ground bears less. Those options are drawn up with an engineer overseeing them:

MBIE's guidance says the TC2 slab Options 1 to 4 are not expected to need specific engineering design, but structural engineers must oversee their documentation; they apply to simple plan shapes and carry limits on wall and roof cladding weight.8

On TC3 land every foundation is . Two of the routes MBIE's guidance sets out there use a slab of the kinds on this page: a waffle slab on deep piles, and a TC2 slab option on ground that has been improved first.

For TC3 land, MBIE's guidance gives sample details for a waffle slab on deep piles.9 On TC3 land, site ground improvement aims to improve the ground so one of the TC2 slab options can be used, and MBIE's guidance says ground improvement that forms part of the foundation needs a building consent, and may need a resource consent as well.10

What each route involves is in TC3 foundations, to specific engineering design, and the TC2 options in TC2 foundations: pod rafts to the engineer's plans.

What decides between a pod raft, a waffle slab and a ring foundation?

The ground first, then the house, then the engineer. The ground category sets how far the investigation goes:

The ground category sets how deep the investigation goes: MBIE's guidance expects a shallow investigation for a new house on TC1 or TC2 land, and on TC3 land a site-specific deep investigation with geotechnical analysis.11

What the investigation finds sets which foundations the guidance allows, and MBIE's guidance puts TC2 and TC3 land outside good ground:

MBIE's guidance says TC1 is generally regarded as the category most likely to be good ground. It says TC2 and TC3 fall outside the definition of good ground for standard residential construction, so their foundations are not within the scope of NZS 3604.12

The house narrows the choice. The TC2 slab options are limited to simple plan shapes and set cladding weights, as set out above, and the waffle slab carries its own limit on brick veneer. The engineer's design settles it. How the ground, the house and the engineer narrow the choice, step by step, is in Foundation types and what decides them.

Is Firth's RibRaft the same thing as a waffle slab?

RibRaft is Firth's brand name, and it describes only Firth's product. A waffle slab is MBIE's name for one of its TC2 options. Whether a particular system matches one of MBIE's options is for the engineer who specifies it, and the scope of each system is on its own certificate or appraisal, as set out above.

Is one of them cheaper or quicker than the others?

What moves the price of any of them is the ground, the design and the site, and the ground category can change which slab is being priced at all:

On TC2 land, MBIE's guidance sets out enhanced slab options rather than a standard NZS 3604 slab, so the ground category changes the slab being priced.13

Can any of them be insulated?

How a slab counts in the house's energy-efficiency calculation, and the insulation options H1/AS1 lists for it, is in Insulated slabs and slab edge insulation.

Who to contact

A geotechnical engineer
What the ground under your section is, and what it will carry. They investigate it and write the report the foundation is designed from.
The engineer who designs your foundation
What goes under the house, and why. Thickness, steel, beams and the system itself are settled here.
Your council
Whether the work needs a building consent, what has to be shown, and when it is inspected.
The Licensed Building Practitioners register
Whether the person doing restricted building work holds a licence for it. It is a free public search and it takes a minute.
Us
What we would build, what it would cost, and what we would need from you before we could start.

If you are told something is not possible, it is always worth asking which of these decided it. The ground and the Code are fixed. A design and a programme sometimes are not.

What we do here

UF builds pod raft foundations for TC1 and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

If you have been given one of these and want to know why, send the plans and the geotechnical report. We will tell you what the ground and the design point to, and what is still open.

Sources

MBIE's Canterbury guidance, Parts A and C, is published on building.govt.nz. Each pod raft system's certificate or appraisal, and the scope it covers, is on MBIE's register, Building CodeHub.

See also the technical category entry in the glossary.

  1. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 5.3.1. Checked . Read the source
  2. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 2.1 and Table 2.1. Checked . Read the source
  3. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), Table 5.2. Checked . Read the source
  4. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part C, Version 3a (April 2015), section 15.1.1 and Table 15.1. Checked . Read the source
  5. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 5.3.1, Figures 5.10 and 5.11. Checked . Read the source
  6. MBIE Building CodeHub, register entries for pod raft floor systems. Checked .Source: Ministry of Business, Innovation and Employment, Building CodeHub (codehub.building.govt.nz), licensed under CC BY 4.0; restated in part. Licence terms
  7. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), Tables 5.1 and 5.2. Checked . Read the source
  8. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), sections 5.2 and 5.3. Checked . Read the source
  9. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part C, Version 3a (April 2015), section 15.2, Figures 15.8 and 15.9. Checked . Read the source
  10. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part C, Version 3a (April 2015), June 2015 update to section 15.3. Checked . Read the source
  11. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), Table 5.2. Checked . Read the source
  12. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 3.1. Checked . Read the source
  13. MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012), section 5.3.1. Checked . Read the source
Technical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guideType B1 / Type B2 (house)MBIE's Canterbury guidance names for a timber-framed house with a suspended timber floor on a perimeter concrete foundation. B1 has stucco, weatherboard or light texture cladding; B2 has brick or concrete masonry veneer.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read the guideSpecific engineering designDesign where the design or design method is non-standard, outside the Acceptable Solution or Verification Method. It is usually done by a Chartered Professional Engineer.MBIE, The guide for Canterbury builders: Below-floor work, April 2013 · as at 15 September 2026Read the guide