What your section's paperwork does not tell you

As at · 3 sources

The short answer

By the time you own a section you have a stack of documents, and it is easy to assume between them they cover the ground. They mostly do not. A map covers a district. A certificate covers a product. An approval covers a set of plans. Only one document in the whole stack is about your section, and that is the geotechnical report from an investigation on that ground. This page goes through what each of the others leaves out, so you know what has not been checked yet.

Key points

  • The published technical category data describes itself as “the best information available at the time of publication on Canterbury Maps in 2017”, and says the categories “were intended to have a limited life and were not intended to be updated over time”.1
  • Under MBIE's CodeMark guidance, a council “must accept” a current, registered CodeMark certificate as establishing compliance with the Building Code when the product is used within the conditions on the certificate; outside them it “will be unable to rely solely on the product certificate”, and CodeMark “does not eliminate the need for a building consent or building consent authority inspections”.2

Does my section have a technical category?

Possibly not, and the map will not say so in those words. Rural land, land beyond the earthquake land-damage mapping, and the Port Hills and Banks Peninsula were never given a at all. Where the map reads N/A, no category was ever set. That is not a grade, good or bad, and it says nothing about the ground either way.

This matters most on exactly the land people are buying now. Across the parts of greater Christchurch taking the most new houses, the map gives no category over almost all of the land, and almost every growth area named in the Christchurch, Waimakariri and Selwyn district plans sits outside the categories, with only a few exceptions around Prebbleton and Tai Tapu.

The data says something about itself, too, which is worth reading before leaning on it:

The published technical category data describes itself as “the best information available at the time of publication on Canterbury Maps in 2017”, and says the categories “were intended to have a limited life and were not intended to be updated over time”.1

What does a liquefaction map tell me about my section?

Less than its edges suggest. Christchurch City Council says its own district plan liquefaction layer is not suitable for generating land information memorandum comments, because the mapping is subjective and the shapes are probably inaccurate.

Outside greater Christchurch it is looser again. On the district liquefaction maps, a zone boundary follows the edge of a geological unit mapped at a regional scale. It is not a line drawn from testing on any one section, and it takes no notice of where a property boundary runs. A map layer is not an assessment of a section, and the councils that drew these ones say so.

Will a map show me whether there is fill on my section?

No. The regional geological map shows where fill is known across a district. It does not tell you whether there is fill on your section.

Can I look up my section's wind zone?

For most of Canterbury there is no map to look up. There is no published wind zone map for Christchurch City or Banks Peninsula, and no free online map can give a section its wind zone — the national one says so itself. The zone is worked out for that site under the timber-framing standard, or it comes back on a project information memorandum from the council.

Does a land information memorandum cover the ground?

Not in the way people expect. Christchurch City Council's page on what a land information memorandum covers does not list groundwater or fill, and the council says it does not assess an individual property, analyse the land further, or search for hazard information beyond the legal minimum. A memorandum is a record of what the council already holds. It is not a substitute for having the ground investigated.

On a new subdivision there is a further gap. Waimakariri District Council says some natural hazards may not yet be identified, so the project information memorandum, the land information memorandum and the title can all be silent about them at the point you buy.

Does a product certificate say anything about my ground?

It says what it covers, and the conditions are the point:

Under MBIE's CodeMark guidance, a council “must accept” a current, registered CodeMark certificate as establishing compliance with the Building Code when the product is used within the conditions on the certificate; outside them it “will be unable to rely solely on the product certificate”, and CodeMark “does not eliminate the need for a building consent or building consent authority inspections”.2 Pod raft systems carry either a CodeMark certificate or a BRANZ Appraisal, and each one sets out the scope its standard details cover.3

A certificate describes a product used within stated conditions. It can be silent on technical categories and liquefaction altogether, and where it is, the limits on what ground the floor may sit on come through the manufacturer's manual behind the certificate rather than the certificate itself. A certificate number on its own tells you nothing about your section.

Does a MultiProof approval cover my section?

No. It covers a set of plans. The council still assesses the site-specific parts before it grants the consent, foundations and site drainage among them, and the scheme's guidance says nothing about how it applies on land in one technical category or another.

The subdivision engineer signed the land off — is that not enough?

It is not the same statement. In Waimakariri, the engineer's statement that subdivided land is suitable for building says in its own terms that it does not remove the need to inspect the foundation conditions when each house goes up.

So what is actually about my section?

One document: the report from a geotechnical investigation on that ground. It is the only thing in the stack that is about your place rather than your district, your product or your plans, and it is what the foundation is designed from.

There is one more absence worth knowing about, because it costs money. Nothing in the council's or MBIE's published guidance says who arranges and pays for the geotechnical report on a new house built outside an insurance claim. Agree in writing who does, early — the investigation comes before the foundation can be designed.

Who to contact

A geotechnical engineer
What the ground under your section is, and what it will carry. They investigate it and write the report the foundation is designed from.
The engineer who designs your foundation
What goes under the house, and why. Thickness, steel, beams and the system itself are settled here.
Your council
Whether the work needs a building consent, what has to be shown, and when it is inspected.
The Licensed Building Practitioners register
Whether the person doing restricted building work holds a licence for it. It is a free public search and it takes a minute.
Us
What we would build, what it would cost, and what we would need from you before we could start.

If you are told something is not possible, it is always worth asking which of these decided it. The ground and the Code are fixed. A design and a programme sometimes are not.

What we do here

No map, listing or guide can stand in for an investigation of your ground. What goes under your house is decided by the geotechnical engineer who investigates it, the engineer who designs the foundation, and the council that checks the design.

Send what you have been given. We will tell you what it covers, what it does not, and who to ask for the rest.

Sources

The technical category map and its own description are on Canterbury Maps. MBIE's CodeMark guidance and the MultiProof scheme are published on building.govt.nz. Product certificates and appraisals for raft floor systems are listed on CodeHub.

See also the technical category entry in the glossary.

  1. Environment Canterbury, MBIE Technical Categories dataset, description (data.govt.nz catalogue). Checked . Read the sourceSourced from Canterbury Maps and partners and licensed for reuse under the CC BY 4.0 licence (MBIE Technical Categories; item credit: Canterbury Earthquake Recovery Authority); quoted in part. Licence terms
  2. MBIE, CodeMark Scheme Guidance, September 2023. Checked . Read the sourceSource: Ministry of Business, Innovation and Employment, CodeMark Scheme Guidance (September 2023), building.govt.nz. © Crown copyright. Licence terms
  3. MBIE Building CodeHub, register entries for pod raft floor systems. Checked .Source: Ministry of Business, Innovation and Employment, Building CodeHub (codehub.building.govt.nz), licensed under CC BY 4.0; restated in part. Licence terms
Technical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guide