Feed pads and feed storage: surfaces that are loaded, scraped and hosed every day of winter
As at
Ultimate Foundations ·
The short answer
A feed pad carries stock standing still, which is harder on a surface than stock walking; a silage floor carries a loaded machine working a blade against it, which is harder again. Both live inside the farm's dirty-water system, so their falls and kerbs are effluent decisions as much as concrete ones. And both earn or lose their keep at the same few places — the apron at the mouth, the trough line, the joints the blade crosses — all of which are set out before the pour, not discovered after it.
Key points
- Stock standing still punish a surface more than stock moving across it. The trough line — where every animal stands twice a day — is the wear line, and it is detailed, not hoped about.
- A feed pad is part of the dirty-water system. Its falls and kerbs decide what the effluent system has to swallow, exactly as effluent and water sets out.
- The loader is the real client on a silage floor. Joints, falls and the apron are laid out for a blade that crosses them every day, or the floor spends winter chipping at its own edges.
What is a feed pad asking its concrete to do?
Every job at once, in the same slab.
It stands the herd for long spells, so the surface needs grip that lasts under hooves that are not going anywhere. It carries the feed-out wagon on a regular line, so the pavement under that line is doing truck work, not cow work. It gets scraped and hosed daily, so the surface and the falls have to give the scraper a fair run. And everything that lands on it has to end up where the effluent system expects — which is the quietest of its jobs and the one that decides its running cost.
A pad laid out around all of that is a pleasure to run. A flat rectangle with a trough on it is a yard that happens to have feed on it, and it runs like one.
Why do the falls decide the pad's running cost?
Because everything a pad catches is either shed clean or stored dirty.
The pad sits inside the clean-dirty line the effluent page draws: rain that crosses collected feed and manure is dirty water, and the pad's falls and kerbs decide how much of it there is. Falls that take wash-down to the right channel, kerbs that keep clean yard water from crossing the pad, and a junction with the race that does not leak — those are formed-in decisions that set what the storage downstream has to hold.
The pad is poured once. The storage it feeds is paid for every season.
What makes a silage floor and its apron different?
The machine, and what the machine does all winter.
A silage floor is worked by a loader with a blade, every day the pit is open. The surface has to survive scraping, the joints have to sit where the blade crosses them square rather than catching an edge, and the falls have to move leachate to where the system collects it — downhill all the way, with no ponding against the walls. The apron at the mouth is the hardest-working concrete on most farms: the loader turns, brakes and lifts on it, loaded, in the wet, at the same spot.
Where it is going wrong, it shows at the mouth first. An apron breaking up at the pit entrance is the usual first call, and rebuilding it properly — thickness, joints and falls for the machine that actually uses it — is a contained job with an outsized return.
What do bunker walls need that a yard never does?
An engineer, before anything else.
A bunker wall is loaded sideways: silage compacted against it, machinery working against that, and the wall holding it all back. That is structural work — designed by your engineer, with the loading stated and the concrete, reinforcement and joints drawn — and poured exactly to it. The same goes for any wall that holds ground at the pit. Our part is the pour being what the drawings assumed: the profile, the finish, and the joints where the design put them.
If someone offers you bunker walls without an engineer in the conversation, the price is not the thing to compare.
What about pads and bunkers already in use?
The usual list is short and worth fixing before winter.
Trough lines worn hollow, aprons broken at the mouth, kerbs that were never poured, a junction that leaks onto the race, joints that have become trenches under the blade. Each has a contained fix, each is cheaper than the habit of working around it, and each is staged around feeding — the pad and the pit are in use every day, so the sequence is planned before anything is cut, exactly as on the dairy shed floors page.
If the apron at your pit mouth is breaking up now, it will not be better in June — worth a quote this side of the season.
Who to contact
- A geotechnical engineer
- What the ground under your section is, and what it will carry. They investigate it and write the report the foundation is designed from.
- The engineer who designs your foundation
- What goes under the house, and why. Thickness, steel, beams and the system itself are settled here.
- Your council
- Whether the work needs a building consent, what has to be shown, and when it is inspected.
- The Licensed Building Practitioners register
- Whether the person doing restricted building work holds a licence for it. It is a free public search and it takes a minute.
- Us
- What we would build, what it would cost, and what we would need from you before we could start.
If you are told something is not possible, it is always worth asking which of these decided it. The ground and the Code are fixed. A design and a programme sometimes are not.
What we do here
Tell us what the pad or the pit is doing — where it wears, where it ponds, what the loader is doing to the joints — or send the plans and the engineer's drawings if it is new work. We will tell you which parts are pad, apron, kerb and joint work we can form and pour, what is structural and needs your engineer, and what belongs to your effluent system designer before anyone prices concrete.
Sources
This page is written from the work itself. Your engineer's drawings, your effluent system design, your regional council's consent and your milk company's supply terms are the documents that govern this work, and they are the ones to read beside it. The rest of the farm work is on concrete on the farm.