Shed slabs and machinery floors: the pour, and the pour inside a shed that already stands
As at
Ultimate Foundations ·
The short answer
A shed floor carries machinery, not furniture — point loads from jacks and stands, implements backed in hard, and everything that drips, spills and gets hosed off them. The floor decisions that matter are made before the pour: where it needs to be thicker, where the falls and the drain go, what comes up through it, and the apron at the door, which is where shed floors actually fail. And a good share of this work is not a new shed at all — it is a floor poured inside one that is already standing, which is its own kind of job.
Key points
- Say what will stand on it before the floor is designed. A hoist, a full workshop press, a loaded implement on narrow stands — each wants the floor locally stronger, and that is designed in, not hoped for.
- The apron at the door takes more punishment than the floor behind it: every entry, every turn, every weather. It is a detail worth doing properly once.
- Pouring inside an existing shed is a planning job first — access, reach and sequence — and it is some of the most worthwhile concrete on a farm.
What is going to stand on it — and where?
That one answer shapes the whole floor.
A machinery floor fails under points, not under areas: the jack under one corner of a loaded implement, the stand a header rests on all winter, the legs of a hoist. Where those live, the floor wants to be locally stronger — a thickening designed in before the steel is laid, the same idea as the thickenings in a house floor, scaled for farm loads. Tell the floor's designer what the machine is; the floor will be designed for it. Say "just a shed floor" and the floor will be designed for a shed, which is a different thing. If machinery with a known weight is part of the plan, the floor should know about it from its designer, not find out from the machine.
Why do shed floors fail at the door?
Because the door is where inside meets outside, and both sides fight the slab edge.
Every vehicle crosses it, usually turning. Weather gets at it from the outside while the floor stays dry within. Ground settles away from it. An apron — a proper outside landing, with its own edge and falls, meeting the inside floor at a level that does not chip — is the difference between a doorway that lasts and a ragged step that grows teeth. It is also the obvious thing to pour in the same visit as the floor, and the first corner cut when a job is priced by area.
What belongs in the floor before it is poured?
The same answer as a house, with farm quantities: everything that would otherwise be a saw cut.
Power to the workshop end and the welder. Water to a wash-down corner, and a drain with a fall to it — a wash bay is a shape in the concrete, not a fitting. Air lines if a compressor is part of the plan. A conduit to the far door for the gate or the lights you have not bought yet. All of it goes in while the floor is open and costs a trench afterwards.
What does pouring inside an existing shed involve?
Planning, mostly — which is why it is quoted after a look, not off a floor area.
The questions are practical: what access the doors give, how far the concrete has to travel from where a truck can actually stand, what the old surface or base is like underneath, and what has to keep working while the floor goes in. Done in stages, a working shed can usually keep working. And it is honest to say this is some of the most satisfying work there is: a shed that has stood on gravel or broken concrete for twenty seasons, finally with a floor that drains, sweeps and takes a jack without flinching.
If the shed already exists, do not let anyone price the floor without standing in it first — us included.
Who to contact
- A geotechnical engineer
- What the ground under your section is, and what it will carry. They investigate it and write the report the foundation is designed from.
- The engineer who designs your foundation
- What goes under the house, and why. Thickness, steel, beams and the system itself are settled here.
- Your council
- Whether the work needs a building consent, what has to be shown, and when it is inspected.
- The Licensed Building Practitioners register
- Whether the person doing restricted building work holds a licence for it. It is a free public search and it takes a minute.
- Us
- What we would build, what it would cost, and what we would need from you before we could start.
If you are told something is not possible, it is always worth asking which of these decided it. The ground and the Code are fixed. A design and a programme sometimes are not.
What we do here
Tell us what the shed is for and what will stand on it — machinery, stands, a hoist, stored weight — and whether the building exists yet. Photos help, and so does the machine list, rough as it is. We will tell you where the floor wants to be stronger, what belongs in it before the pour, what the apron needs, and how an existing shed can be done in stages around its own use.
Sources
Written from the work itself. What goes into a floor before any concrete — the same thinking at house scale — is on what goes inside the floor. The rest of the farm work is on concrete on the farm.
Page history
Current as at .