Storing product: floors that keep what you bought worth what you paid

As at

The short answer

Stored product is money sitting on a floor, and the floor decides how much of it is still worth selling or spreading when it leaves. Grain, fertiliser, feed and produce all ask the same things of concrete — dry from below, clean enough to recover from, flat enough to sweep, strong where the loader works — and they punish the same places: the doorway, the bay walls, the joints under the blade. All of it is set out before the pour, which is why a storage floor is designed from what will sit on it and what will move across it, not from the shed's footprint.

Key points

  • Moisture from the ground spoils product from underneath, invisibly. Keeping it out is decided by what goes under and into the slab — a design layer, chosen before the pour, not a surface fix after it.
  • A dividing wall that a loader pushes product against is doing structural work, exactly like a silage bunker wall. It gets an engineer, or it gets a lean it never loses.
  • The doorway is where storage floors fail first: weather, wheels and the blade all meet on the one strip of concrete. The apron and the threshold are details worth drawing, not leftovers.

What does stored product ask of a floor?

To give back everything that was put on it.

A storage floor is measured at the end of the season: how much of what went in came out clean, dry and saleable. That turns into concrete decisions — a surface flat enough to sweep and scrape to, falls that keep any water that gets in moving to the door rather than under the pile, and a slab that keeps ground moisture out of the product sitting on it. A shed floor that was poured as a shed floor, with none of that asked, stores product the way a paddock does: mostly, with losses.

Whoever buys or certifies what you store has requirements for how it is kept, and they are worth reading before the floor is drawn: cheaper to meet in the boxing than to argue with later.

Why are bays and push walls engineer territory?

Because product leans and loaders push, and the wall holds both.

A bay wall with fertiliser or grain heaped against it, and a loader packing or recovering against that, is loaded sideways exactly as a silage bunker wall is — and the answer is the same as on feed pads and feed storage: your engineer designs it, with the loading stated, and the pour matches the drawings. Bays laid out as walls-on-a-floor, without that conversation, move at the base and lean a little more each season. Our part is the forming, the pour and the joints being exactly what the design assumed.

What keeps product dry — and what has that to do with the pour?

The slab is the lid on the ground's moisture, and the doorway is the hole in the roof.

Ground moisture moves up into anything that sits on bare or badly built concrete; what stops it is decided in the slab's build-up, under and inside the pour, where it can never be added later. Above the slab, the water that matters comes in at the doorway — blown rain, wheel-carried mud, wash-down from the apron — so the threshold detail, the apron's falls away from the opening and the strip of floor just inside do more for dry product than anything else on the drawings.

If you are converting an existing shed to storage, that is the page to read next: sheds and machinery floors covers pours inside buildings that are already standing, and a storage conversion is usually exactly that.

What about floors already storing product?

Most of the fixes are at the places taking the punishment.

Doorway strips broken up by wheels and weather, joints turned into trenches under the blade, bay walls moving at the base, floors that sweat under the pile: each has a contained fix, and the difference shows in the next season's losses rather than in anything you can photograph the day we leave. The work is staged around what the shed is doing — empty bays first, the doorway in the window between loads — and planned before anything is cut.

The cheapest time to fix a storage floor is just after it empties. If the shed is coming up to that point, that is the week to ask for a quote, and the quote should say which bays and which strips it covers.

Who to contact

A geotechnical engineer
What the ground under your section is, and what it will carry. They investigate it and write the report the foundation is designed from.
The engineer who designs your foundation
What goes under the house, and why. Thickness, steel, beams and the system itself are settled here.
Your council
Whether the work needs a building consent, what has to be shown, and when it is inspected.
The Licensed Building Practitioners register
Whether the person doing restricted building work holds a licence for it. It is a free public search and it takes a minute.
Us
What we would build, what it would cost, and what we would need from you before we could start.

If you are told something is not possible, it is always worth asking which of these decided it. The ground and the Code are fixed. A design and a programme sometimes are not.

What we do here

Tell us what you store, how it moves in and out, and where the floor is costing you — the wet corner, the doorway, the bay that leans. Send photos and the engineer's drawings if there are any. We will tell you which parts are floor, apron, bay and joint work we can form and pour, what is structural and needs your engineer, and what is worth fixing first by what it spoils.

Sources

This page is written from the work itself. Your engineer's drawings, your council's consent and the storage requirements of whoever buys or certifies your product are the documents that govern this work, and they are the ones to read beside it. The rest of the farm work is on concrete on the farm.