A foundation is poured once, and everything built afterwards sits on top of it. What it has to be is not picked from a catalogue: it is set by the ground, by the geotechnical report on that ground, and by the engineer's design — and every one of those belongs to somebody other than the contractor who pours it.

The part most people meet late
A , a report somebody else commissioned, a design nobody has walked you through. These turn up in a quote or a set of plans, at the point where a decision is already due. This page sorts the guides by who is reading them, says what the foundation is about to ask of you, and names who decides each part of it.
Ultimate Foundations is based in Christchurch. UF builds pod raft foundations for TC1 and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

Start here
Which of these is you
You are building your own home
You have bought a section, or you are about to, and you are being asked to agree to things nobody has had to explain to you before: a category on a map, a report you did not commission, a design you cannot check. The foundation is the first large spend that cannot be undone, and it is settled long before the part of the build people enjoy.
You are the builder pricing the job
You are pricing a house, or you have one consented and the slab is the next thing in the programme. Nothing frames until the foundation is in and the council has passed it, so the foundation sets the date the rest of the build counts from, and a change to the ground or the design moves that date. It is the part of your programme you do not pour yourself.
You are the designer or the engineer
You are specifying the foundation, or checking what somebody else specified, and what you need from a page like this is the edition a statement came from and the day it was read. Every fact here names its source, its edition and the part of the document it sits in, and says where the published guidance stops and your design starts.
What a foundation done right looks like afterwards
You can check all of it, and none of it is a matter of opinion. The ground was investigated before the design was drawn. The design was the engineer's. The council's inspection before the pour was passed, and no concrete went in until it was. And the paperwork naming who did the work reached the owner at the end, because it is needed for the code compliance certificate.
Four things, on paper, each of them held by somebody other than the contractor who did the job. That is the same list whichever of the three readers above you are, and it is what you are paying for.
What it looks like when it goes wrong
When a foundation goes wrong the concrete is rarely the expensive part. It is the design done twice, the inspection failed and re-booked, and a frame that cannot go up until the floor it stands on does. None of that shows in a price, and all of it shows in a programme.

What to have ready before anyone prices it
Whoever prices your foundation will ask for the same four things, and they are the same four wherever you go:
- the plans, and the engineer's foundation design if there is one yet;
- the geotechnical report for the section;
- the site address, and anything worth knowing about getting a truck onto it;
- who the builder is, if there is one yet.
Two of those are not yours to produce, and that is the point. The report comes from a geotechnical engineer and the design from a structural one, and the order those two happen in is what sets everything after them.
Where each reader should start
If you are building your own home
- Building a home: the ground, the foundation and the paperwork, in order — the guides in the order the questions come up, from the section to the paperwork at the end.
- Technical categories: TC1, TC2 and TC3 in plain English — what the categories are, and where to look one up for an address.
- Building on a new subdivision lot: the map, the reports and the council — what the category map's data says of itself, and what the council asks for.
- Your geotechnical report: what it is and what it decides — what an investigation of the ground finds, and why the foundation design starts from it.
- Credentials, and how to check any contractor — what a licence, a record of work and a product certificate are, and where you look each one up yourself.
If you are the builder
- Foundations — one page per foundation: what it is, what the engineer decides, what happens on site, and what changes the price.
- Pod raft foundations — how one goes in, in order, and the council's inspection before the pour.
- TC2 foundations and TC3 foundations — what each category means for the foundation, and what the engineer decides about it.
- Certificates and producer statements — what a certificate of work, a record of work, a producer statement and a code compliance certificate each are, and who issues them.
If you already know what you want it to look like
Not every decision about a floor is a technical one, and the person choosing how it looks is often not the person reading about the ground. These are decided before the pour like everything else.
- What you can have in the floor of your house — a warm floor, a floor with no steps in it, and the things that cannot be added once the concrete is down.
- What a concrete floor can look like — what the finished surface can be, what sealing actually means, and why the joints are part of it.
- The concrete can be the floor — leaving the slab as the finished floor rather than buying a second floor to lay on top of it.
- What goes inside the floor — the shapes and the services that are set on the day, including a step-free shower and a doorway with no drop.
If the job is on a farm
- Concrete on the farm — dairy shed floors, yards, races, tanker pads, shed and machinery floors, and the pours inside sheds that already stand. Start with the job you are trying to make easier, not with a product name.
If you are a main contractor or a quantity surveyor
- For main contractors: what you can check before you invite a price — the legal entity and the named licence holder, each with the free public register you check it on.
- For builders — what is needed to price a foundation, and what comes back.
- Credentials, and how to check any contractor — what a licence, a record of work and a product certificate each are, and where to look each one up.
If you are the designer or the engineer
- Foundation types and what decides them — the ground decides first, then the house, then the engineer.
- Pod rafts, waffle slabs and ring foundations: what each is, and what decides between them — the three types side by side, as MBIE's guidance describes them.
- Insulated slabs and slab edge insulation — the insulation options H1/AS1 lists for a slab, and how the slab counts in the energy-efficiency calculation for the whole house.
- How we write and check these guides — where the facts come from, who checks them, and what the date on a guide means.
- Glossary — the words these guides use, each one defined from its source.
Not ready to talk to anybody yet
Nothing here asks you to make contact. If you would rather work out what is likely to go under the house before you speak to anyone, start with what the ground decides and what each foundation type is for.