Who we help

A foundation is poured once, and everything built afterwards sits on top of it. What it has to be is not picked from a catalogue: it is set by the ground, by the geotechnical report on that ground, and by the engineer's design — and every one of those belongs to somebody other than the contractor who pours it.

A slab set out with permanent edge forms and steel mesh before the pour, a pump truck and two workers behind

The part most people meet late

A , a report somebody else commissioned, a design nobody has walked you through. These turn up in a quote or a set of plans, at the point where a decision is already due. This page sorts the guides by who is reading them, says what the foundation is about to ask of you, and names who decides each part of it.

Ultimate Foundations is based in Christchurch. UF builds pod raft foundations for TC1 and TC2 sites, and engineered foundations for TC3 sites, using Firth RibRaft, Allied SuperSlab or MAXRaft depending on what the engineer's plans specify.

A crew member tying steel over the pods, the boxing along the edge and hills beyond

Start here

Which of these is you

You are building your own home

You have bought a section, or you are about to, and you are being asked to agree to things nobody has had to explain to you before: a category on a map, a report you did not commission, a design you cannot check. The foundation is the first large spend that cannot be undone, and it is settled long before the part of the build people enjoy.

Building a home, in the order the questions come up

You are the builder pricing the job

You are pricing a house, or you have one consented and the slab is the next thing in the programme. Nothing frames until the foundation is in and the council has passed it, so the foundation sets the date the rest of the build counts from, and a change to the ground or the design moves that date. It is the part of your programme you do not pour yourself.

What each foundation involves on site

You are the designer or the engineer

You are specifying the foundation, or checking what somebody else specified, and what you need from a page like this is the edition a statement came from and the day it was read. Every fact here names its source, its edition and the part of the document it sits in, and says where the published guidance stops and your design starts.

How we write and check these guides

What a foundation done right looks like afterwards

You can check all of it, and none of it is a matter of opinion. The ground was investigated before the design was drawn. The design was the engineer's. The council's inspection before the pour was passed, and no concrete went in until it was. And the paperwork naming who did the work reached the owner at the end, because it is needed for the code compliance certificate.

Four things, on paper, each of them held by somebody other than the contractor who did the job. That is the same list whichever of the three readers above you are, and it is what you are paying for.

What it looks like when it goes wrong

When a foundation goes wrong the concrete is rarely the expensive part. It is the design done twice, the inspection failed and re-booked, and a frame that cannot go up until the floor it stands on does. None of that shows in a price, and all of it shows in a programme.

A boom pump pouring concrete over steel and orange underfloor heating pipe, the crew working across the floor

What to have ready before anyone prices it

Whoever prices your foundation will ask for the same four things, and they are the same four wherever you go:

  • the plans, and the engineer's foundation design if there is one yet;
  • the geotechnical report for the section;
  • the site address, and anything worth knowing about getting a truck onto it;
  • who the builder is, if there is one yet.

Two of those are not yours to produce, and that is the point. The report comes from a geotechnical engineer and the design from a structural one, and the order those two happen in is what sets everything after them.

Not ready to talk to anybody yet

Nothing here asks you to make contact. If you would rather work out what is likely to go under the house before you speak to anyone, start with what the ground decides and what each foundation type is for.

Technical category (TC1, TC2, TC3)The categories of residential land on the flat in greater Christchurch, TC1 to TC3, as MBIE's Canterbury guidance defines them.MBIE, Repairing and rebuilding houses affected by the Canterbury earthquakes, Part A, Version 3 (December 2012) · as at 15 September 2026Read it at the sourceRead the guide